Electrical Work
Recently, an indication from PECO detected a hot signal from the meter. Consequently, the power lines were cut because they could not gain entry to the church facility.
A subsequent meeting with a PECO tech determined an electrician would have to troubleshoot to rule out a problem on the church end.
Please let me know if this is something you can assist with. Thank you!