Bathroom Remodel
We had bathroom marble put in sometime 2006-2007. Last job tile contractor did, but refused to use Hardi Backer screws because they required pre drilling to set. So he only glued to plywood.
I reset tiles but I didn’t use screws either, big mistake on my part. Same area in front of shower so I’m guessing that plywood is loose. I can’t attach pictures to this.
If you are interested in this project, please reach out. Thank you!