Plumbing Work
I have a 5 ft bathtub with a hot and cold fill valve but no shower. I would like to install a single valve temperature compensated valve and a shower along with the tub filler. The house was built in 1957 galvanized pipe. We would have to remove a part of the the wall. The wall is thick lath and plaster 1.25 inch, hard as the back of god's head. I will take reasonability of replacing the wall that we remove and tilling the new part of the wall. If you're interested, please reach out.