Plumbing Work
Our 98 year old home, while mostly copper, still has some old steel pipes that feeds our 2nd floor bathroom shower/tub. The 1st floor bathroom wall and part of the ceiling will have to be opened up to get the steel replaced. There is the added challenge of those walls are drywall slapped directly on top of plaster+lathe. Pics and additional write-up here: https://alangarrison.io/plumbing/. If you're interested, please reach out. Thank you!