Multiple Residential Repair/Remodeling
Immediate:
Trim & baseboard installation of my primed pine materials. Paint 2 coats.
Floor installation (11 steps & 250 sq ft), Engineered floating hardwood (foam, glue tongue, and groove).
Miscellaneous repairs to kitchen cabinets.
Paint 4 walls with my materials (primer & 2 coats).
Reinstall the under-house laundry dryer vent piping after I cleaned it. I have all materials.
Stage 2:
* Install 2 toilets and supply lines. I have materials.
*Install 2 shower curtain rods. I supply materials.
*Remove and install 2 ceiling fans. I supply materials.
*Replace 4 small sheets of exterior smart siding and paint match. I supply materials.
*Add stairs and rail to the upper deck, connecting to the lower deck. Add trek decking to the top to match existing. You supply materials.
*Remove and replac...