1 - 25 of 163 experts
TI
get quote
Trimble Inc
BZ SCORE: 101
374.0 Total projects
Notable project: (Building permit. 3690 Couts St, San Diego, CA, 92110). Midway-pacific highway; building electrical and plumbing permits for the addition of kitchenettes at the existing 2nd floor veterans village dorm rooms. work to include addition of ada sink cabinets and sinks with associated electrical work. structure was originally built in 2012. zone: is-1-1/geo 31/cup 90-1127
HC
get quote
Hinkle Construction
BZ SCORE: 109
63.0 Total projects
Notable project: (Bldg-alter/repair. 6544 W Hollywood Blvd, Los Angeles, CA, 90028). Tenant improvement. interior partitions. new entry doors acoustical tile ceiling. wall and floor finishes. handicap access toilet room. handicap access fitting room. new lighting. new handicap access ramp with new opening in non-bearing wall for exterior door. new cashwrap
get quote
Notable project: (Combination building permit. 4853 Kesling Ct, San Diego, CA, 92117). Repair in-kind due to fire damage: roof sheathing; and approximately 20 % of the roof rafters (2x6 @ 24 oc) and ceiling joists ( 2 x 6 @ 16 oc); replace as needed wood studs. wall & floor coverings to be replaced as needed. misc. electrical mechanical and plumbing work included as needed due to fire damage... (more)
ZC
get quote
Zacek Construction
BZ SCORE: 100
AB
get quote
Action Builders
BZ SCORE: 98
26.0 Total projects
Notable project: (Bldg-alter/repair. 16680 W Cumbre Verde Ct, Pacific Palisades, CA, 90272). Window (17) and door (10) change-out (same size & type) for residential buildings. dual glazing labeled and certified by national fenestration rating council (nfrc) is required for doors and windows replaced in all residential buildings three stories or less per section 152(b) of title 24
SC
get quote
Shaw Construction
BZ SCORE: 97
64.0 Total projects
Notable project: (1 & 2 family detached dwellings. 400 S 16th St, San Jose, CA, 95112). Scope of work to include: remove all tile and fixtures in existing 12 x 16 bathroom located on second floor former. building a non-load bearing dividing wall to create space for two bathrooms approximately 5'6 x 16 each. (1) new 20amp circuit for power to the additional bathroom new overhead led lighting new... (more)
EC
get quote
Eads Construction
BZ SCORE: 96
Notable project: (Commercial warehouse. 766 S Hwy 59 Hwy, #59, Merced, CA, 95341). 1000sf commercial. metal warehouse addition; city w/s
TBC
get quote
CMS
get quote
BA
get quote
Brian Andersen
BZ SCORE: 94
CCL
get quote
KDA
get quote
TA
get quote
Tinker & Assoc
BZ SCORE: 93

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.

TBC
get quote
NC
get quote
CLM
get quote
Chris L Maimone
BZ SCORE: 92
MCS
get quote
HC
get quote
JSG
get quote
SPP
get quote
AMG
get quote
MM
get quote
ZTC
get quote
DWM
get quote
MHC
get quote

BuildZoom: The Best Way to Hire

Let us do the work for you. Simply describe your project and we'll help you find the perfect contractor.