Generator Installation
Move generator to already installed pad, run or install (generator, outdoor interrupt, conduit, wiring, transfer switch, main breaker) all which I have already purchased. Hook transfer switch to main panel and install individual breakers up to capacity of generator ( around 14 kw). Test when gas installation is completed. Hopefully same day you are working on transfer switch install.
If interested, please get in touch with me. Thank you!