Fire restoration - simple electrical building (framing) in one room - reinsulate and sheetrock
Remove and replace garage door header. r/r (e) stucco to match existing in-kind
Building Type:
27 - 1 family dwe...
Seismic upgrade in accordance w chapter a3 of the cebc
Seismic upgrd in accordance w standard plan set a
Voluntary seismic upgrade (see notes)
Soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4
Building Type:
24 - apartments
Voluntary strenthening upgrade - new plywoods and anchor bolts
Building Type:
27 - 1 family dwe...
See revision #1 for trusses on 23 karen rd. also roof trusses: unit 25 karen rd - install new cross brace and bridging. replace broken bottom chord. revision #1 rmm 8/21/13 - added new roof trusses on unit 23 karen rd. also
Soft story retrofit per sfbc chapter 34b engineering criteria to addition 3 moment frames. 2012 iebc appendix a-4
Building Type:
24 - apartments
Fire repair: to include truss replacement as per truss package provided, re-roof, 7/16 " osb., #15 felt, 30 yr. comp., install (1) 2.5 ton, 13 seer, 56k btu unit, frame/replace f.p., re-hab of el., insulation, windows and drywall.
Seismic retrofit for soft level. addition straps hold downs sds screws clips plywood gypsum board blocking and anchor bolts
Building Type:
24 - apartments
280 fairview st - remodel bathroom replace flooring through out. replace 2 light fixtures and a ceiling fan per approved plans. *code enforcement 2x
Permit Type:
Minor remodel
Comply nov 200669879.repair side&rear exterior wood stairs.less than 50% of structure. provide handrails at the side exterior concrete stairs &the rear exterior wood stairs.remove the lock from the door separating the side passageway&the rear yard.install an automatic door closer on front side door
Building Type:
24 - apartments
In accordance to plan set a and california existing building code appendix chapter a3
Addition 111 sf to 2nd floor for master bedroom closet. incld whole house remodel: kitchen bathroom bonus room laundry room relocation and strucutal/foundation. entered by: woom
Reconstruct interior stair master bedroom and kitchen remodel with no exterior work all per approved plans
Permit Type:
Minor remodel
Repair damaged roof trusses in warehouse (address on building is 23 karen rd) revision #1 czn 5/22/12 additional structural work being done per engineer
Voluntary seismic retrofit: install plywood and foundation plates and bolts around perimeter (1344sf). work is in accordance with california existing building code appendix chapter a3
Voluntary seismic upgrade for (e) mutlifamily apartment building: adding steel frame at garage for voluntary seismic improvement for soft story