Their license was verified as active when we last checked. If you are thinking of hiring AIR CONDITIONING COMPANY INC, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
This b/p is issued to install the following tools :- ( i ) capping tool ( 600 lb ) ( ii ) hrs-clean hood or wet bench ( 465 lb ) ( iii ) wt burnin ( 680 lb ) ( vi ) temp cycle oven ( 520 lb ) ( v ) liquid nitrogen dewar ( 280 lb ) and all other tools are less than 100 lb. see tool sheet attached. note:- fire inspection is not req'd
Install type ii duct air handling unit(make-up air) and grease duct with pollution control unit located in mechanical room. per engineer- hoods are to be installed under a different permit. see application comments
Installation of hvac system for (5) levels of parking(below grade) in a high rise mixed use building with smoke control stairwell pressurization fire pump room ventilation system and process cooling
This b/p is issued to install the following tools :- ( i ) capping tool ( 600 lb ) ( ii ) hrs-clean hood or wet bench ( 465 lb ) ( iii ) wt burnin ( 680 lb ) ( vi ) temp cycle oven ( 520 lb ) ( v ) liquid nitrogen dewar ( 280 lb ) and all other tools are less than 100 lb
Install 4 chillers for existing soundstage area etc. (backlot b at cbs studios) in a protective acoustically lined structure approved by chiller manufacturer (must meet l.a. city structural plan check & permit requirements as determined by structural plan check section before installing chiller enclosure). lamc-99 chap. 11 conditions for refrig. machinery rooms apply
Condenser water system for telecommucation building ventilation for electrical room fuel storage tank room transformer room ats room ( automatic transfer switch) room & bathroom room. existing type one hood modified as noted on plans. med. temp. existing equipments. recorded lot tie agreement to be one building. alteration relocation of garage exhaust fan heat pump & ahu as shown on p... see more
Hvac system for 2 story + basement medical office buidling (design for occupancy b). work scope includes 2 rooftop air conditioning 9 split air conditioning 2 hot water boilers 4 hot water pumps 2 exhaust fans fire/smoke dampers combustion air duct and air conditioning ductwork
Supplemental permit to collect fees for (1) of additional inspection(s) per inspection correction notice # _ _ _ _ _ _ and (date).this permit does not authorize any additional work or extend the expiration date of the original permit
Supplemental permit to collect fees for (1) additional inspection(s) per inspection correction notice #u57989 dated 05/22/2006. this permit does not authorize any additional work or extend the expiration date of the original permit
Installation of a garage exhaust system (2 levels) and misc ventilation for misc rooms. generator not part of this plan check generator exhaust (excluding radiator exhaust to be done by others) ok
This b/p is issued to install the following tools :- ( i ) capping tool ( 600 lb ) ( ii ) hrs-clean hood or wet bench ( 465 lb ) ( iii ) wt burnin ( 680 lb ) ( vi ) temp cycle oven ( 520 lb ) ( v ) liquid nitrogen dewar ( 280 lb ) and all other tools are less than 100 lb. see tool sheet attached. note:- fire inspection is not req'd
Tenant improvement for stages 8 & 9 at paramount pictures. load over 400a. note: original plans for new distribution feeders switchboards panels and branch ckts. for stages 8 and 9 under pcis 09041-20000-07814
Tenant improvement - new hvac system pacific theaters. kitchen ventilation systems (type i & ii) are not part of this p/c approval. revision 11/09/01 - reroute duct work & added f/s dampers. permit #00044-10000-08124
1. plan check and permit 4 process cooling systems for telecom rooms. structural o.k. or permit required for roof loading. 2. permit ductwork alteration and additional registers. all for bldgs. 268 & 270
Hvac system for (6) level parking garage (2) underground and (4) above. cfd system for2 underground levels.above ground considered open garage levels per building code
Ten. improvements in entire 9th. floor of exist'g hi-rise with exist'g life/safety syst.(anonciation & shut down for all floors except 1st. floor. smoke evac. by breakable windows.)
Install 3 off hours outdoor chillers on roof replace 2 bathroom exhaust fans addition 2 libert units and provide one supply fan fan to provide outside air to all the existing fan coil units
New gymnasium building and upgrading of central plant systems. (installation of new boiler upgrading chillers new air handlers and air distribution). approved plans given to engineer
Change of use from mechanical room to metal shop @ level l4 rooms 1003 1004 1005(total 2600 sq ft) and change of use from metal shop to art conservation shop @level l4 room m1077 1078