Their BuildZoom score of 93 ranks in the top 27% of 191,428 Florida licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring All Exterior Aluminum Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Single family dwelling w 10 x 20 rear lanai * noc for single family dwelling in o.r. bki 2950 pg 932*site plan not to scale (reduced)* **site approved w/cond single family dwelling w 10 x 20 rear lanai *4 trees to be retained on site **co must be obtained within 365 days following the end of the impact fee suspension - if co is not issued impact fee will become due prior to calling fo... see more
10 x 20 composite roof and screen room on 10 x 16 existing slab * noc for composite roof and screen room in or 3131/2145 * site approved for 10 x 20 composite roof and screen room on 10 x 16 existing slab
Detached garage w/elect & slab **noc in file for det garage** (#201607199 open exp pool permit failed final insp needs per needs to repr pay fees & final insp) **site approved 24 x 48 detached garage w/elect & slab ** ** site check by tim greene on 1/24/2020 to site verified that no work has been done on this property *** ok to close this application ***** application expired voided &... see more
Single family dwelling w/covered lanai & entry * noc for single family and detached garage in ebridge**site approved w/cond for single family dwelling w/30 covered lanai & 24 x 46 detached garage *co must be obtained within 365 days following the end of the impact fee suspension - if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06** **... see more
12 x 17 composite screen room * noc for screen room in or 3076/2154 * flood zone ae/x post firm structure located flood zone ae screen room will be compliant with elevation reqrmt 42.3 according to e/c on file elevation verification not required for this scope **site approved for 12x17 screen room on ex slab only
Remove & replc 40x30+29x21 aluminum roof over and 25.83x17 aluminum carport only *noc for reroof in or 3054/2381* site apprvd for 40x30+29x21 aluminum roof over and 25.83x17 aluminum carport only
Two 3 x 8 x 4 concrete slabs on both sides to existing concrete slab and a 8'-0 x 16'-0 screen room **noc for two 3-8x4 concrete slabs on both sides of existing concrete 8 x 16 screen room in or bk 3039 pg 1706* *site approved for two 3 x 8 x 4 concrete slabs on both sides to existing concrete slab and a 8'-0 x 16'-0 screen room *no trees to be removed*
Single family dwelling only * noc in ebridge for new home only * *site approved w/cond for single family dwelling w/10x14.67 covered screened porch *co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06** **no trees to be removed**
Single family dwelling only w/gas & fireplace *noc in ebridge for new home only* **site approved w/cond single family dwelling only *must plant 2 native trees prior to co **co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06**
Single family dwelling only w/gas & fireplace *noc in ebridge for new home only *site approved w/cond for single family dwelling w/10x14.67 covered porch *co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06** **no trees to be removed**
Single family dwelling only w/gas & fireplace * noc in ebridge for new home only * **site approved w/cond single family dwelling only *must plant 2 native trees prior to co **co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06**
Single family dwelling only w/gas & fireplace * noc in ebridge for new home only * **site approved w/cond single family dwelling only *must plant 2 native trees prior to co **co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06** *** --- pe... see more
Single family dwelling only w/gas & fireplace * noc in ebridge for new home only * **site denied not meeting the req'd 15-foot front setback off (deer park lane)** **** application voided/expired/closed *********file was pulled and disposed of due to exceeding 180 days without activity and plans expired due to 12/31/17 fbc code change
Single family dwelling only w/gas & fireplace * noc in ebridge for new home only * **site denied not meeting the req'd 15-foot front setback off (deer park lane)** **** application voided/expired/closed *********file was pulled and disposed of due to exceeding 180 days without activity and plans expired due to 12/31/17 fbc code change
Remove 22x10 existing patio pan roof and replace with 17x11 pan roof on existing slab **noc for 17x11 patio cover in or bk 2999/pg 313** *site approved to remove & replace 17x11 pan roof on existing slab no change in setbacks reroof *no trees to be removed*
Remove 22x10 existing patio pan roof and replace with 17x11 pan roof on existing slab **noc for 17x11 patio cover in or bk 2999/pg 313** *site approved to remove & replace 17x11 pan roof on existing slab no change in setbacks reroof *no trees to be removed*
10 x 16 composite screen room on existing slab only * site apprvd for 10x16 screen room w/sfd 201809671 * flood zone ae/x structure located in flood zone x fema regulations do not apply *noc for 10x16 composite roof screen room in or 2961/2390*
Single family dwelling only w/gas & fireplace * noc in ebridge for new home only * **site approved w/cond single family dwelling only *must plant 2 native trees prior to co **co must be obtained within 365 days following the end of the impact fee suspension - by 5/12/2018. if co is not issued impact fee will become due prior to calling for final inspection per ar 13.04-06**