Share your project details and we'll reach out to
Alternative Power Generation Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Alternative Power Generation Inc, 2750 N Spcaport Entry, Atwater, CA (Employees: Brent Allan Jerner, Coleby James Jerner, and Marcia Ann Jerner) holds a General Building, Electrical, Solar, Machinery And Pumps license according to the California license board.
Their BuildZoom score of 110 ranks in the top 4% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Alternative Power Generation Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Pro tip:
We generally recommend hiring a contractor with a score higher than 95.
Alternative Power Generation Inc has a BuildZoom score of 110, which places them above 96% of 336,931 contractors in California.
Activity
1 project
2025
8 projects
2024
38 projects
2023
Our building permit records indicate that Alternative Power Generation Inc has worked on at least
47.0 projects over the past 3 years.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
Experience
36 projects
Commercial Renovations
46 projects
Solar installations
Analyzing permits over the last 4 years shows that Alternative Power Generation Inc mostly works on
solar installation
and commercial renovation
projects.
Pricing
1 project
< $5k
11 projects
$5k-$20k
29 projects
$20k-$50k
3 projects
$50k-$100k
Value Not Public: 5.0 projects
The typical size of their permits is approximately $30,213. This graph shows the distribution of these job values.
Pro tip:
For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.
Building Permits by Alternative Power Generation Inc
** 7.74kw 18 panel + (2) batteries ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
**8.60kw 20 panels + (2) batteries** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
** 6.88kw 16 panels ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f \rovide smoke/carbon form at inspection
** 225a mpu** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
** 7.250kw 25 panels ** removing and replacing existing solar due to re-roof. photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspe... see more
Remove and replace of (e) solar (layout changed) ***new plans to be onsite*** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspe... see more
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection ***includes 100 amp mpu*****
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection ****includes 100 amp upgrade****
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
** building #1 ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
Photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection
** building #2 ** photovoltaic contractor shall be present at time of inspection - call 209-723-2489. do not cover mechanical or plumbing vents with solar panels. contractor shall provide job site access & a secure ladder with minimum of 3 rungs above roof line. inspection times 8-12 1-4 m-f provide smoke/carbon form at inspection