4 potholes for design and construction of a 48-inch to 60-inch diameter rcp storm drain from the intersection of farm road and palm grove lane east on farm road to buffalo drive and from buffalo drive and donald nelson avenue south along the buffalo drive to the elkhorn springs detention basin. the project also includes design and construction of a new inlet structure at the detention...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
Revision: refer to submittal plan(s) for item(s) revised; 345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 arman...
see more
An approximate 5 wide area of landscaping on the north side of bathroom drive extending westward from campbell road for approximately 553 consisting of trees shrubs ground cover and an irrigation system to meet town center landscaping requirements
345 unit mixed-use condo project-some offsite and utilities dave bratcher got c.k. to sign mylars without the permission to do work from morran propery...they will get permision later *sdr-5692--#32 - meet with ccsd to discus posible mitigaation. cannot find proof of condition being satisfied contacted eng. aztec- 396-3486 armando pineda-10/30/07-he will check into it
Revision: refer to plan submittals for items revised; aspen pacific group office building #4 in the hills center north business park; land use # l-19-8 c-315-05 appl 732731 revise grades around building rev -1
Revision: refer to submittal plan(s) for item(s); centennial academy - montecito town center south mf # 6784 construction permit # 9246 ldcaf=$300;ldpck=$2, 327.08 both pd 10/08/03 gr# 112351 (ldtsg=$6, 946.40, ldcpc(10/28)=$1050, ldenc=$25, lddap=$400, ldins $2114.29 pd gr#113609)ldcpc(12/23)=$900 tia appvd 092603;clv#117/03;(ldprp $600 pd gr#124814) q to plng 100803;frm plng 102803;...
see more
Centennial academy - montecito town center south mf # 6784 construction permit # 9246 ldcaf=$300;ldpck=$2, 327.08 both pd 10/08/03 gr# 112351 (ldtsg=$6, 946.40, ldcpc(10/28)=$1050, ldenc=$25, lddap=$400, ldins $2114.29 pd gr#113609)ldcpc(12/23)=$900 tia appvd 092603;clv#117/03;(ldprp $600 pd gr#124814) q to plng 100803;frm plng 102803;(ldprv $400 pd gr#125642) mylars rcvd 122403 c-93-03;
Balconies on the west side of the building located at the northeast corner of third street and garces avenue beginning on the second floor and continuing to floor six that will protrude into public airspace for approximately 2. balconies on the west side of the building located at the southeast corner of third street and bonneville avenue beginning on the second floor and continuing t...
see more
10 potholes for the design of reinforced concrete box and channel system needed for the las vegas wash system within grand teton. the mountain spa to buffalo facility will include approximately 4000 lf of rcb