Bayline Mechanical Inc, 310 Shaw Rd, S San Francisco, CA (Employees: Daniel Michael Caracciolo, Frederick Thomas Caracciolo, and Kevin Frederick Caracciolo) holds a Plumbing license according to the California license board.
Their BuildZoom score of 107 ranks in the top 6% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Bayline Mechanical Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
This pays for inspections related to original permit # pw20241218870 filed 12/18/2024. dow: work category: 5p; bring restrooms to ada compliance. install one hi-low drinking fountain. all work is on the 25th floor
Renewal of pw20240515788: work category: 5p; install one new fitness center. 6 new showers 6 basins 4 toilets 2 urinals 1 drinking fountain 1 water heater 1 ejector pump. all work is in the basement
Work category: 5p; bring core restrooms to ada compliance. install one hi-low drinking fountain. install 4 pantry sinks. install 3 reverse pressure backflow devices. all work is on the 24th floor
This pays for inspections related to original permit # pw20250312729 filed 3/12/2025. dow: work category: 5p; install 1 hi-low drinking fountain. install 2 new basins in corer restrooms for ada compliance. all work is on the 8th floor
Work category: 11p; remove one reverse pressure backflow device. all work is on the 8th floor. pic# aekj7135. tap#201400. spid# 134-291-0538. meter# 0084360024. serial # 236789. manufacturer watts. model lf009qt
Work category: 5p; floor 17 - install one new shower lavatory water closet floor drain and water heater. install one new backflow preventer at coffee bar
Work category: 5p; floor 19 - room 1922 install one break room sink and appliance hook-up room 1932 install one wellness sink coffee bar 1920 - one water line and one backflow for carbonated machine coffee bar 1933 - one water line
Work category: 5p; install 1 break room sink with reverse pressure backflow device 1 wellness sink 1 coffee sink 1 new hi-low drinking fountain and bring 1 urinal to ada compliance. all work is on the 10th floor
Work category: 5p; install 1 break room sink and point of use water heater 1 cafe room sink and point of use water heater with rp backflow device for espresso machine 1 electric water heater for lab area 1 rp backflow device for industrial hot and cold water 3 lab sinks with eyewashes 3 equipment hook up set ups with industrial hot/cold water and drains. all work is on the 3rd floor
Work category: 5p; install one drinking fountain 2 all gender restrooms (1 basin and 1 toilet each) one coffee pantry one kitchen pantry 2 backflow preventers and new fixtures in existing locations at core restrooms. all work is on the 3rd floor
Work category: 5p; install one break room pantry. install one mother's room pantry. install 2 new basins in core restroom at existing basin location. install one reverse pressure backflow preventer in break room. all work is on the 20th floor
Work category: 5p; make men's and women's restroom ada compliant. install one new mop sink and faucet. install one new drinking fountain with bottle filler. all work is on the 21st floor
Work category: 5p; install 2 new pantry sinks in existing locations. install one new drinking fountain with bottle fillers. install 2 new ada compliant shower valves in existing shower locations. all work is on the 1st floor