Share your project details and we'll reach out to
Blair Dubak
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 90 indicates that they are licensed or registered but we do not have additional information about them.
Their license was verified as active when we last checked. If you are thinking of hiring Blair Dubak, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Construct new non-structural partition walls in existing office space. reconfigure existing acoustical drop ceiling to accommodate new walls. minor electrical and hvac reconfiguration of existing systems. relocate two existing sprinkler heads to meet code. plaster and paint as needed
Remove and dispose of existing kitchen &; dining area cabinetry plumbing appliances &; finishes and replace with new cabinets countertop appliances under cabinet lighting and plumbing fixtures. layout and location to remain the same. no structural work to be performed. unit 601
Remove existing recently completed kitchen finishes repair/upgrade insulation and reinstall kitchen as is reusing many of the original materials. no structural work
Unit 3: renovate 3 bathrooms and one 1/2 bathroom renovate the kitchen and laundry room and addition a new master closet. as part of this work we will be updating the plumbing and electrical (from in-unit service mains) adding new millwork new air conditioning and replacing the windows
Changing occupancy from 30 units to 29 by combining 2 units.;interior work includes creating interior stairway between two units through a structural slab updating electrical &; plumbing relocating existing sprinkler heads interior partition alterations and new finishes (plaster paint tile stone flooring cabinetry). exterior work includes replacing the existing roof deck decking material
Remove existing finishes from master bathroom and kitchen. install new finishes including plaster paint tile cabinetry plumbing fixtures electrical fixtures cork flooring appliances. all plumbing to remain in existing locations. no structural work layout to remain the same. no alteration to sprinklers
Interior renovation of existing living area;includes demolish to interior partitions to open up the space and addition structural beam. updated plumbing and electrical. new finishes including new kitchen &; bathroom tile stone refinish floors new doors insulation board plaster and paint
Permit cost reflected in long form permit alt502370 per inspector leo martinez. permit was approved by boa on december 15 2016. seeking short form permit to begin interior demolition rough framing (not-structural) and rough plumbing &; electrical.- all interior renovation
Complete interior renovation including all new finishes (flooring plaster paint tile) updated electrical updated plumbing and hvac new cabinetry. no structural work. no exterior work.unit 1004
Exploratory demolition of exterior wall where water damage has occurred for emergency purposes. replace any rotted framing members and siding as needed. no structural work other than needed as repair
Remove existing kitchen floors appliances cabinetry and countertops and replace with new tile floors appliances stone countertops. repaint and reinstall existing cabinets. update electrical fixtures &; plumbing fixtures. existing layout to remain. repaint entire kitchen. no structural work.; unit 28b
Remove existing interior flooring and replace. demolish 2 existing bathrooms and kitchen finishes and replace with new finishes plumbing fixtures & appliances. no structural or exterior work
Remove wallpaper repair plaster and repaint. renovate 2 existing bathrooms- new tile stone vanity plumbing fixtures. refinish existing hardwood flooring. update electrical. no structural work