Disconnect electrical supply and unit from existing roof curb remove from roof. set new unit in place and make a necessary connections. start unit and ensure proper operation. clean work site and dispose of old unit
Construct single-family dwelling.143-00-00-015
Construct single family dwelling. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. 3 bed 2 bathroom 1 story project# 20200248
Construct single family dwelling. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. 3 bed 2 bathroom 1 story. project# 20200247
Construct single family dwelling. 3 bedrooms 2 baths 1 story. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. previous house demolished under permit 200500307
Construct single family dwelling. 3 bedrooms 2 baths 1 story. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. project 20190786
3 bedrooms 2 bathrooms 1 story. project 20181511 construct single family dwelling. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit
Hvac equipment change out like for like. project 20240414
Construct single family dwelling. 3 bedrooms 2 baths 1 story setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. project 20220164 2/24/22- change order for footing repair conditionally approved
Replace 10 ton pakage unit
Completing work previously permitted and started by others. this work includes metal roof installation new electrical throughout home new plumbing installed and bathroom added new duct work for 2-ton heat pump split system and framing and carpentry where walls were added. new work: replace windows new electrical hvac and plumbing. all new sheetrock and insulation flooring painting and...
see more
Construct single family dwelling. setbacks approved as shown on site plan. setbacks measured from exterior building wall per section 5-200(c) of rh zoning ordinance. subcontractors included in permit. 3 bed 2 bathroom 1 story. project# 20191743
3-ton split system. 92% gas furnace evaporator coil and condensing unit like for like
1517 Bayberry Pl, SC
2016-03-22
One 2.5 hvac system like for like.one 3 ton hvac system like for like.
Post frame workshop with new meter
2928 Misty Plum Ct, SC
2015-09-07
Replace 2.5 ton split system heat pump like for like.
2258 Brattonsville Rd, SC
2014-12-18
Project# 20140656 quick tech machining inc. - new building 40 x 60 x 12