Their BuildZoom score of 113 ranks in the top 3% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Comfort Controls Heating & Air Conditioning, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Comfort Controls Heating & Air Conditioning Services
Pro tip:
We generally recommend hiring a contractor with a score higher than 95.
Comfort Controls Heating & Air Conditioning has a BuildZoom score of 113, which places them above 97% of 336,931 contractors in California.
Activity
32 projects
2025
33 projects
2024
38 projects
2023
Our building permit records indicate that Comfort Controls Heating & Air Conditioning has worked on at least
103.0 projects over the past 3 years.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
Experience
98 projects
HVAC projects
48 projects
Mechanical projects
Analyzing permits over the last 4 years shows that Comfort Controls Heating & Air Conditioning mostly works on
hvac project
and mechanical project
projects.
Pricing
7 projects
< $5k
66 projects
$5k-$20k
9 projects
$20k-$50k
2 projects
$50k-$100k
Value Not Public: 18.0 projects
The typical size of their permits is approximately $9,485. This graph shows the distribution of these job values.
Pro tip:
For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.
Building Permits by Comfort Controls Heating & Air Conditioning
Changeout to existing hvac system only. no additional electrical mechanical plumbing or structural work permitted.; changeout to existing hvac system only. no additional electrical mechanical plumbing or structural work permitted.; install heatpump and air handler
Change-out split system to split system. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%
No duct work permitted. change-out mini-split system to mini-split system. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%
No duct work permitted. change-out swamp cooler to mini-split system. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%
No duct work permitted. change-out mini-split system to mini-split system. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%
No duct work permitted. change-out roof mount to roof mount. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%
Electrical service panel replacement or emergency repair only. no additional electrical mechanical plumbing or structural work permitted.; changeout 200 amp main panel. same for same
Changeout to existing hvac system only. no additional electrical mechanical plumbing or structural work permitted.; like for like - replace air conditioning condenser & coil
Hvac permit: change out min split. like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Hvac permit: change out mini split. like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Commercial hvac permit: change out mini split. like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Hvac permit: change out min split system like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Hvac permit: change out mini split like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Hvac permit: change out mini split like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
Hvac permit: change out mini split like for like. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%. cf-1r-alt-hvac on file: carbon monoxide & smoke alarms required. reference crc sections r315 & r314
6.4kw solar photovoltaic system and 0gal solar wh system (water heater installed null). all supply side connections main breaker change-out and/or panel upgrade will require a second inspection. carbon monoxide & smoke alarms required. reference crc sections r315 & r314 water conserving fixtures are required to be installed throughout this residence per sb 407 (note: residences built ... see more
Change-out mini-split system like for like cf1r-alt-02-e attached. cf1r added required documents: **note additional required documents at final inspection per cf1r attached: cf2r and cf3r-mec-25-h refrigerant charge verification required when refrigerant containing components and installed or altered. carbon monoxide & smoke alarms required. reference 2022 crc sections r315 & r314. al... see more
No duct work permitted. change-out split system to split system. the existing unit shall be removed. the new unit shall be placed in the same location as the existing unit and shall not exceed the size of the existing unit by more than 25%