Share your project details and we'll reach out to
Craig J Kurker
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 90 indicates that they are licensed or registered but we do not have additional information about them.
Their license was verified as active when we last checked. If you are thinking of hiring Craig J Kurker, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Oil to gas (nat) conversion. install new american standard high eff gas furnace w/16 as air conditioning. install gas piping. 4 lines for 48 gallon gas w.h. provided by gas company. heatloss cooling load provided. must meet 2009 irc iecc along with amendments
Install oil to gas conversion 2 slant fin steam boilers 120, 000 in 97, 000 out natural gas. 305 sq feet of steam 2-40 gallon gas hw heaters rheem install 7 lines & combustion air system. radiation count provided. must meet 2009 irc iecc along with ct amendments
Replace oil boiler & addition indirect water heater cast iron boiler w stone lined indirect water heater new yorker.crown tabago lt-twz100 must meet 2009 irc iecc along with ct amendments
Oil to (nat) gas conversion. install american standard 120, 000 btu high eff furnace with 5 ton's of air conditioning 16 seer air conditioning replacement. heat/cooling gain provided. must meet 2009 irc iecc along with ct amendments
Loss/gain required. castle heating to install heating and cooling equipment. original contractor has been let go. pressure test and inpect gas piping and equipment. install boiler and indirect water heater tie in air handlers. retrofit to code heat
Emergency steam oil boiler replacement. install burnham mst 288 mega steam with tankless coil. must meet 2012 imc iecc along with amendments. radiation count provided
Repair 1st floor furnace code violations installed by homeowner (no permit). ductwork needs to be to replaced and tested. replace exhaust and combustion air piping retrofit to code
Oil to gas conversion. install gas fired boiler with 50 gallon indirect water heater. install gas piping to pool heater generator and fireplace insert as per code
Gas pressure test for new 3rd floor apartment repiping gas to water heater and future gas conversion burners (2) 1st and 2nd floor. m rispoli contractor: 203-537-6121
Installation of 2 hydronic boilers for 2nd and 3rd floor with baseboard radiation two 275 gallon oil tanks power vented boiler for first floor and power vent for existing warm air furnace retrofit to code