No Description Available
Permit Type:
New structure
High output inc. to construct temporary stage for black community and student theater annual fashion show at lavietes basketball pavilion harvard university. staging to be constructed of stageright me-1000 heavy duty modular decking system. inspection ready april 14 at 2:00pm. on-site job lead: dave maclean mobile phone 603-204-4008
High output inc to install temporary platforms and loudspeaker structures on boston common at the corner of charles and beacon for boston's march for science. drawings and specs enclosed. install to be performed friday 4.21.17. installation to be removed saturday 4.22.17 following the event. onsite job lead: james hirsch mp 617.908.2958
Construct temporary stage and press riser on boston common at corner of charles and beacon for boston women's march. staging to be constructed of stageright me-1000 heavy duty modular decking specs and drawings enclosed. load-in saturday 1/21/17 at 6a.m inspection-ready 10a.m. break down and remove same day following event. on-site contact: bob hirsch mp 401.954.4954
Install temporary press riser in faneuil hall. riser to be constructed of stageright me-1000 heavy duty modular decking specs and drawing enclosed. load-in saturday 1/14/17 at 1p.m. inspection-ready 4p.m. break down and remove immediately following event. on-site contact: matt furman mp: 781.630.0519
Construct temporary presentation stage and press risers for event at noon 11/29/15 at faneuil hall. inspection ready 11/28/15 at 5:00 p.m. staging constructed of stageright me-1000 heavy duty modular decking system. on sight contact: james hirsch mp (617)908-2958
Building Type:
Commercial
Construct stage and camera platform on boston common near corner of park and beacon. stage 3.5'high x 12'deep x 16'wide. camera platform 5'high x 4'deep x 16'wide. building 11/18/15 2:00a.m. inspection ready 11/18/15 9:00 a.m. remove 11/18/15 directly following event. onsite contact: james hirsch mp(617)908-2958. boston parks and recreation dept. contract #11550
Remodel basement *1/22/19 change of contractor*
Install temporary stage at lavietes basketball pavillion at harvard university. stage to be constructed of stage-right me-1000 heavy duty event decking system-specs attached. ready for inspection thursday morning 4/23/15. stage to be removed 4/25/15 following event. onsite job contact: jeremy stark mobile phone: (617)640-9605
Install temporary presentation stage and press riser for british consular event at faneuil hall. presentation stage to be 20ft.wide x 8ft. deep x 16in. high. two tier press riser to be 24ft wide x 8ft deep. tier #1: 16in high. tier #2: 24in high. load in: 9a.m. 2/9/15.inspection ready: 2p.m. 2/9/15. breakdown and remove: 7:30p.m. 2/9/15. on site contact: kevin baldwin mp: 802.999.8241
Install two temporary decks inside faneuil hall for private united states department of state press event. deck #1 to be 8ft deep x 20ft wide x 16in high. deck #2 to be 4ft deep x 24ft wide x 30in high. ready for inspection friday 1/30/15 at 3:00pm. decks to be removed directly following event on saturday 1/31/15. on site job contact: james hirsch, mobile phone 617.908.2958
Building temporary stage and press riser for event at faneuil hall square. stage: 24'-0 x 12'-0. ffe 3'-0. press riser: 16'-0 x 8'-0. ffe 3'0 and 4'-8. load in: 5am 11/13/14. inspection ready: 7am 11/13/14. break down and remove: 9am 11/13/14. on site job contact: james hirsch. mp 617.908.2958
Construct 2 temporary decks in front of faneuil hall for good morning america television show. deck #1 to be 16 ft wide x 24 ft deep x 2.5 ft high. deck #2 to be 8 ft wide x 8 ft deep x 2.5 ft high. load in sunday night 9/7/14. break down and remove monday afternoon 9/8/14. construction supervisor david margolis mp: 339.225.0905
Building temporary performance stage at 540 harrison ave, boston. stage dimensions: 12'-0 x 24'-0. ffe: 2'0. load in: 6pm 10/24/14. inspection ready: 10pm 10/24/14. breakdown and remove: 11:59pm 10/25/14. on site lead: bob hirsch mp: 401-954-4954
Building Type:
Commercial
Building temporary stage for biergarten event at boston cyclorama 539 tremont street. stage to be 12'wide x 12'deep x 2 high and constructed using stageright me-1000 modular event arena decking (specs attached). job loads in october 2 2013 at 7:00a.m. ready for inspection same day at 1:00 p.m. event begins same day at 7:00p.m. break down and remove stage immediately following event. ...
see more
Construct a temporary indoor stage at 539 tremont st in the boston center for arts cyclorama for new england ski and snowboard ball. stage to be 16'wide x 12'deep x 2'high. staging to be built using stageright me-1000 event/arena modular decking (specs attached). load in and building oct. 9 at 7 a.m. ready for inspection oct. 9 at 1 p.m. event oct. 9 at 5:30 p.m. break down and remove...
see more
Building Type:
Commercial
Temporary installation of stage at lavietes basketball arena at harvard university. stage constructed of stage-right me-1000 heavy duty event decking system. ready for inspection thursday 4.24.14 by 2pm. onsite contact: dave maclean 603-204-4008. breakdown and removal sunday 4.27.14 midnight