Share your project details and we'll reach out to
Deer Park Paving and Excavating Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Deer Park Paving and Excavating Inc, 1921 Fawn Way, Sykesville, MD (Owned by: Robert Eugene Uhler) holds a Electricians license and 1 other license according to the Maryland license board.
Their BuildZoom score of 90 indicates that they are licensed or registered but we do not have additional information about them.
Their license was verified as active when we last checked. If you are thinking of hiring Deer Park Paving and Excavating Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
2, 436 replacement dwg. with unfin. basement demolish - ap#170157 $$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Basement finish; will also replace cabinets in kitchen on 1st floor and new fixtures in 1st floor ex bathroom 3/22/18- rewire whole house; heavy up to 200 amp
Construction of new single family dwelling to include attached 2-car garage and covered porch - will occupy a portion of current footprint; existing septic to be replaced (demo existing single family dwelling 168753) revision - 01/05/2018 - correct number of bathrooms to 6 (lw) $$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$ revision - 2/12... see more
Single family dwelling - 2 story unfinished basement with w/o egress 3 bedroom 2 bathroom with covered porch $$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$ revision - 5/2/18 - addition rough-in bathroom only in basement (lw) groundwork only
Single family dwelling replacement dwg. (demo #158260)|2-story w/unfin. bsmt.; 1-car garage under dwg; front porch||$$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Electrical for new single family dwelling 100 amp - phone tv construction of a single family dwelling (modular home) replacement dwelling w unfinished walk out basement demolish a/p # 115147 $$$$ energy efficiency compliance method will use rescheck report attached to the approved plans. $$$$
To complete work on ap# 83644 is listed on application and drawings;|covered porch 60sf; part of existing bedroom to be full bathroom and closet 100 sf to create master bedroom;remove one set of interior stairs in kitchen area and addition new stairs to basement. in living room area|**open electric permits #84816 and #86227**
Single family dwelling w/unfinished basement and 2 car garage|revision 6/14/17 (blh) changed height to 25'||$$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Construction of a replacement sfd; unfinished bsmt; covered porch; deck demolish a/p # 159592 revision 9/19/17 - 3 bathrooms & r-in in basement & front setback (lw) revision 9/21/17 - setback 81 to center of road (lw) $$$$ energy effiiency compliance method will use prescriptive values and requirements. $$$$
Single family dwelling w/partially finished basement; 3-car attached garage|detached garage on seperate permit - #139405||$$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Single family dwelling install (7) smoke detectors (18) switches (26) receptacles (1) air conditioners (3) phones (3) tv cables 4439560850 b130004521 *rec'd amendment on 02/07/14: increase service to 200 amps (heavy up); bge work with*
Single family dwelling w/unfin bsmt; 1-car garage; front porch||$$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Single family dwelling w/unfin bsmt; 1-car garage; front porch||$$$$ energy efficiency compliance method will use prescriptive values and requirements. $$$$
Building permit # 123192 new dwelling - low voltage phone tv |single family dwg||$$$$ energy compliance method will use prescriptive values and requirements. $$$$
Construction of a replacement sfd; unfinished bsmt; covered porch; deck|demo a/p # 159592|revision 9/19/17 - 3 bathrooms & r-in in basement & front setback (lw)|revision 9/21/17 - setback 81 to center of road (lw)||$$$$ energy effiiency compliance method will use prescriptive values and requirements. $$$$
Wiring alterations and new 200 amp service interior alterations to reconfigure floor plan - create hallway and addition half bathroom. plumbing and electrical throughout. new windows and new roof