Lshs - new 3-story classroom building; athletic wing; cove and marketing and corridor 2120. includes sectors 1, 2, 3, 5.2 & 6.2
Building Type:
Commercial - comm...
Construction of 19.5-foot tall steel camera tower with open grate steel platforms 16 sf access ladder 36 sf concrete tower foundation and 9 sf ladder landing
Kitchen bathroom student room renovation - buchanan towers
Permit Type:
New or altered sy...
Kithcen bathroom student room renovation - buchanan towers
Permit Type:
New fixtures
New educational bldg: sehome high school
Permit Type:
New or altered sy...
New educational bldg: sehome high school
Permit Type:
New fixtures
Peacehealth - pharmacy remodel
Permit Type:
New or altered sy...
Relocate 2 thermostats for tenant improvement
Plumbing for starbucks kiosk
Permit Type:
New fixtures
Construction of concrete foundations and steel platforms elevated walkways pipe supports and stairs. steel plateforms and walks all levels total 5456 sf foundations total 1729 sf 77 steel piling
New 140, 000 sq ft middle school with 372 fixtures - four backflow devices two clothes washers one dishwasher two drinking fountains 71 floor drains/sinks one grease interceptor 36 hose bibs one pressure reducing valve 151 sinks/lavs 15 other items 19 tub/showers 16 urinals 52 water closets one water service
New complete mechanical system for 135, 613 sq ft middle school-19 air conditioning unt/heat pumps three boilers gas piping only hydronic heating piping laundry dryer exhaust duct range hood range/oven/broiler four gas water heaters three type 1 or 2 hoods
Complete remodel of existing building on the university of washington tacoma campus including plumbing mechanical piping lab air and hvac. diamond b constructors state contractor's license number: diamobc066ka
Repair work to electrical system sheet rock ceiling system controls system and minor mechanical repair due to water leak. original building permit # bldca16-0004
Transmountain pipeline reactivation pump building 2364 sf containment pad 3266 sf electrical building 602 sf fire house 625 sf mcc building 96 sf berm crossings 1328 sf trasformer pad 170 sf pipe support foundations 448 sf pipe rack 924 sf new pipe line 1144 sf
Install 4 boilers 5 water heaters 2 kitchen hood type 1 1 kitchen hood type 2 1 dryer exhaust 9 exhaust fans with duct 1 exhaust fan with duct kitchen-sf 12 radiant heaters hvac systems and 7 hydronic pumps for high school #4-bldg. c
Relocate existing fire and domestic water lines and buried power to accommodate for subsequent phases of work. work includes demolition of existing pavement installation of sheet pile shoring temporary sediment controls utility relocation grading and interim gravel surface restoration
22-foot x 13-foot foundation for mcc building (2) platform landing foundations including platform steel (2) hvac foundations (1) transformer foundation total for foundations 501.5 sf. total for platforms 59.5 sf
Provide dwv domestic water natural gas lab waste & vent lab air and mechanical piping to an existing building on the uwt campus
3722 188th, WA
2015-04-15
Install 4 boilers, 5 water heaters, 2 kitchen hood type 1, 1 kitchen hood type 2, 1 dryer exhaust, 9 exhaust fans with duct, 1 exhaust fan with duct kitchen-sf, 12 radiant heaters, hvac systems, and 7 hydronic pumps for high school #4-bldg. c.