Install +/- 94 of vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (9) 1 x 14 - hdg galvanized anchor rods connected to mr-sr manta ray heads in yard tensioned to 13 000psi. form and pour a 24 front face x 32 top face steel reinforced concrete cap on top
Wreck and remove existing dock. set piling and construct a new 34 dock as follows: an 8 x 18 walkout connected to a 16 x 12 main dock with a 16 x 4 lower dock out front. existing boatlift to remain in place
Install +/- 112'-6 of vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (21) 1 x 18 & 22 - hdg galvanized anchor rods connected to mr-sr manta ray heads in yard tensioned to 13 000psi. form and pour a 24 front face x 32 top face steel reinforced concrete cap on top....noc req on site
Remove existing 40, 000 lb. lift and catwalk. the main dock and jetski lift to remain in place. install a new 20, 000# capacity boatlift to the right side of main dock. building a new 3 x 42 fixed catwalk to the right of the new boatlift
Wreck and remove existing dock. set piling and construct a new dock. re-install existing pwl on 1 new piling. install a new 30, 000# capacity boatlift on 6 new piling
Install +/- 65 of vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (8) 1 x 14 - hdg galvanized anchor rods connected to concrete deadmen. form and pour a 24 front face x 48 top face steel reinforced concrete cap on top....noc req on site **9/9/2025 1st extension cm**
Install +/- 84.9 of new vinyl sheet pile w/i 1 ft in front of existing concrete seawall and fill void solid with concrete. install (8) 1 x 14 hdg anchor rods attached to concrete deadmen in yard. form and pour a 24 front face x 32 top face steel reinforced concrete cap on top....noc req on site***revision updated drawing showing *no return on right side***
Wreck and remove existing dock. set piling and construct a new dock as follows: a 12 wide x 22 long main dock with a 12 wide x 8 long piling supported lower dock out front. set piling and install a new 13, 000# capacity neptune boatlift to the right. re-install owner's 7 x 10 ez floating dock
Set +/- 60.5 of new vanguard sheet pile in front of existing concrete seawall and pour void solid with concrete. install (7) 1 x 12 hdg tieback rods to concrete deadmen in yard. form and pour a 24 front face x 24 top face steel reinforced concrete cap on top at 5.0navd. edge marine will only be installing +/- 12 of returns on n&s property lines full length to street to be done by others
Install +/- 64 of 8 vinyl sheet pile following pond edge. install 12 - 1 x 10 hdg galvanized anchor rods connected to concrete deadmen in yard. frame top whaler with double 2"x8 pressure treated pine and deck top with 2"x6 composite decking....noc req on site
Set +/- 90 of new vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (12) 1 x 18 hdg anchors rods into yard connected to mr-sr manta ray heads tensioned to 13 000psi. form and pour a 24 front face x 32 top face steek reinforced concrete cap on top....noc req on job site
Install +/- 68 of vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (8) 1 x 12 - hdg galvanized anchor rods connected to concrete steel reinforced deadmen in yard. form and pour a 24 front face x 32 top face steel reinforced concrete cap on top. noc req on job site
Install +/- 65 of vinyl sheet pile in front of existing concrete seawall and fill void solid with concrete. install (8) 1 x 14 - hdg galvanized anchor rods mr-sr manta ray heads in yard tensioned to 13 000psi. form and pour a 24 front face x 32 top face steel reinforced concrete cap on top....noc req on job site
Due to 2'-4 of erosion from natural disaster hurricane irma & ian a toe wall needs to be installed along the 132 of existing seawall. set new vinyl sheet pile in front of existing vinyl seawall. install through bolts through new whaler and existing seawall pour void solid with concrete....noc req on job site
**slip 69** **courageous condo** remove existing boatlift. set piling and install a new 24, 000# capacity boatlift in existing slip. **revision 12/7/23 - change in lift dimensions - increase from 17 to 20')
Remove existing boatlift. set piling and install a new boatlift. new boatlift will not extend any farther from seawall or be closer to property lines than existing boatlift. *note* electrical associated with a boatlift to be permitted and inspected per n.e.c. *note* edge marine construction is not responsible for electrical. homeowner to supply electrician to permit and complete all e... see more