Elocin Construction Co Inc at P O BOX 1563, Martinez, CA 94553, held a Engineer license (#457998) with the California contractors license board with an expiration date of 07-31-2026. We last verified the license was inactive on 01-13-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Administration change of address for current electrical permit no. ew202506066977. electrically disconnect (2) existing chillers for replacement. install electrical connections to (2) new chillers. electrically disconnect (1) existing exhaust fan. install electrical connection to (1) new exhaust fan install (1) electrical connection to (1) new rmcp
Electrically disconnect (2) existing air conditioning units in server room and electrically reconnect (2) new replacement air conditioning units. remove and replace (2) existing local disconnect safety switches circuit distribution wiring and distribution breakers
Electrically disconnect (2) existing chillers for replacement. install two (2) new electrical connections to (2) new replacement chillers. electrically disconnect (1) existing exhaust fan. install (1) new electrical connection to new exhaust fan. install (1) new electrical connection to new rmcp
Electrically disconnect 2 existing 80-ton chillers and electrically reconnect 2 new replacement 80-ton chillers. electrically disconnect 3 existing chilled water pumps and electrically reconnect 3 new chilled water pumps
Furnish and install one (1) new 100a 120/208v/3ph/4w electrical distribution panelboard within boiler mechanical room. furnish and install three (3) new 20a 120v boiler hardwire connections and three (3) new 20a 208v/1ph primary boiler pump motor connections
Disconnect existing electrical power hardwire connections from two (2) existing chillers. reconnect existing electrical power hardwire connections to two (2) new replacement chillers
Disconnect existing electrical power hardwire connections from two (2) existing chillers. reconnect existing electrical power hardwire connections to two (2) new replacement chillers
Disconnect & reconnect electrical power connections to the following cooling tower mechanical system new replacement equipment. (1) cooling tower with (2) 20-hp fan motors & vfd's. (2) cwp 60-hp pump motors with disconnect switches. (2) chem feed systems 120v. (1) fluid cooler. (1) condenser water separator 7.5-hp. and (1) 225a 480v/3ph dist panelboard
Disconnect and reconnect electrical power connections to the following boiler mechanical system new replacement equipment: three (3) boilers three (3) 3-hp primary pumps with motor starters two (2) 15-hp secondary pumps with vfd's and one (1) 200a 208/120v/3ph/4w distribution panelboard
Disconnect existing electrical power hardwire connection to (1) existing chiller. connect electrical power to (1) new chiller from existing electrical distribution panelboard. connect new electrical power to (1) new exhaust air fan & (1) new supply air fan
Install one (1) 100a 120/208v/3ph/4w electrical distribution panelboard for brewery bottling line electrical connections. install electrical power distribution conduit wiring gfci wp in-use receptacles and starters from the new panelboard to the new bottling equipment point of connection. install two (2) 30a 480v/3ph electrical power connection to two (2) new co2 vaporization control ... see more
Install electrical connections to two (2) new replacement cooling tower fan motors with vfd's. install electrical connections to two (2) new replacement condenser water pump motors with vfd's. install electrical connection to one (1) new cooling tower filter pump motor. install one (1) new 100a 120/208v/3-ph/4w 30 circuit electrical distribution panelboard
Furnish and install one (1) new 100a 277/480v/3-ph/4w electrical distribution panel and four (4) new 1-1/2 hp combination pump motor starters and motor connections located withithe penthouse mechanical boiler room
Install one (1) new 250a 480v electrical distribution hardwire connection to one (1) new replacement chiller. install one (1)n new 20a 120v electrical hardwire connection to one (1) new fan coil unit
Install electrical connections to two (2) new replacement rooftop hvac rtu's. install electrical connection to one (1) existing rooftop small hvac package unit from alternate power source
According to the California Contractors State License Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Elocin Construction Co Inc at the California Contractors State License Board.
This is a sample of licensing data; click here to access a complete history.