Share your project details and we'll reach out to
Fay Construction & Restoration Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Fay Construction & Restoration Inc, 1060 Cresta Way, San Rafael, CA (Employees: Andrew James Fay and Darcy L Fay) holds a General Building license according to the California license board.
Their BuildZoom score of 112 ranks in the top 3% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Fay Construction & Restoration Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Horizontal addition at first floor with roof deck at rear of (e) house. new space will ontain an expansion to bedroom and garage. windows and siding at rear on 2nd floor replace. replace furnace. no work visible from public way
Install ufer ground in new foundation elements. install new bedroom and wiring space lds plug additional switches per building permit 202212168487 for interior remodel. 36 lights 30 switches 40 receptacles
Install ufer ground in addition foundation. install lights plugs and circuits for expanded master bedroom and roof deck. install new circuits for replaced furnace. 8 lights 4 switches 8 receptacles
Remove outlets switches and lighting. revert to original in storage area per building permit # 2024-0730-7582. install 2 new outlets and 1 switch off existing sup panel. 1 switch 2 receptacles
Termite & rot damage replacement of 1st and 2nd floor frame members (replacement in kind). replace exterior skip sheathing & moisture barrier where damaged. replace cedar shingle siding (replacement in kind). replace composite shingle roof. replace 3 windows
Replace ground floor shower (removed to facilitate structural repairs). replace existing galvanized water supply lines throughout with copper supply lines. replace existing galvanized waste & vent lines to 2nd floor bathroom sink and kitchen sink with new cast iron and abs
Install new wiring for master bathroom and top floor 1/2 bathroom combined & to include: 6 recessed & 3 wall 2nd fl: mounted it fixtures 5 outlets 6 switches. replace knob and tube wiring (where exposed) with new romex and junction boxes. run up to 6 new circuits and outlets
Window replacent in kind (3) living room west wall (1) living room south wall top fl. (9) windows on north n/s/e walls paint clad w divided light (8) street facing windows total. no plans
Bathroom remodel of ist floor office. replacement in kind of tile floors tile walls sheetrock (5/8") walls and ceiling and plumbing fixtures in existing locations. no structural alterations. no framing modification
Interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator renvoation of kitchens bathrooms bedrooms additon of 3 bathrooms exterior work under separate pa #201507302942
Remodel master bathroom to include new shower pan new supply (copper). replace waste and vent to toilet vanity (2 sink) and shower. replace vanity and toilet in 2nd fl 1/2 bathroom (replacement in kind of fixtures)
New master bedroom bathroom and laundry on 1st story. kitchen remodel on 2nd story. interior work only. all exterior work under separate permi. **n/a for maher** no exterior work approved - requires coa