Field Construction Co has served San Francisco and the broader Bay Area since 1975, offering comprehensive general contracting services for nearly five decades. The firm specializes in new construction, remodeling, renovation, and construction management for commercial spaces designed to support clients' business needs and growth. In 2007, Field Construction transitioned to a new ownership structure led by five internal leaders, increasing principal involvement and deepening the firm's commitment to each project. Their team works in close partnership with clients, maintaining clear communication from project start to finish. Field Construction’s portfolio reflects a wide range of commercial projects completed in the evolving Bay Area, with processes that emphasize transparency and collaboration at every stage.
19th floor:mech: replace existing pneumatic vav controllers with ddc controller. low pressure duct work for new layout. new vav boxes with reheat coils. new exhaust fans. new piping to new vav coils. electrical: lighting fixtures and associated controls power & signal devices and wiring
15/f: interior tenant improvement including multi-use men and women restrooms new partitions finsihes light fixutres ceiling assemblies millwork and plumbing fixtures. mep and fire life safety under separate permit
Suite 3120 (31st/fl): interior demolish of non-structural partitions doors ceiling lighting and finishes. new construction consists of partitions doors ceilings lighting millwork and finishes. mep and fire safety deferred permits
14th fl suite 1450 & 1460: tenant improvement project involves modification of (e) suites to include selective demolition & construction of non load bearing partitions new and relocated light fixtures new doors & frames and glazing system and new finishes
Level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions planters and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate
12 flr; tenant improvement. on 12th floor. scope of work includes demolition of non-structural partitions doors and sidelights millwork ceiling and lighting and finishes and power construction of mother's room and accessible single user all gender restroom and existing accessibility upgrades
35/f and 36/f: removal of interconnecting stair beteween flrs 35-36 and infill of slabs on fl 36. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mechanical and electrical to be deferred permit submittal
34/f and 35/f: removal of interconnecting stair beteween flrs 34-35 and infill of slabs on fl 35. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mechanical and electrical to be deferred permit submittal
Removal of interconnecting stair beteween flrs 33-34 and infill of slabs on fl 34. all floors are vacant and will remain vacant per ab-017. structural plans and calcs are included. mechanical and electrical to be deferred permit submittal
Interior office improvement: to include demolition of (e) non load bearing partitions ceilings lighting and finishes. improvements are to include new partitions millwork ceiling lighting and finishes to match adjacent suite 170
2nd/fl: interior tenant improvement of approx. 2004 gsf of the existing use on the second floor and exterior modifications tot eh roof for the additio of the erv unit to provide make-up air serving the area of the interior renovation
19/fl- interior tenant improvement to include (n) non structural walls (n) light fixtures millwork and finishes mep and fire/life safety under separate permit
4/fl- tenant improvement for lounge (n) common area for tenants to include demolish of no nstructrual partitions and ceiling construction of (n) partitions ceilings power and finishes. mep fire/safety and fire sprinklers shall be on another permit
Changes made to the smoke control system by controls project.electronically controlled actuator added.a relay has been added which will drop power to these actuators.convert fan powered vav electronic control.relay to be added to each fl which will drop power to all the vav's
Suite 3150 interior tenant improvement removal and new non-structural partitions doors ceilings light fixtures plumbing fixtures millwork and finishes. mep and fire/life safety under defered permit
11/fl- ste# 1120: tenant improvement to include demolish of non structrual partitions and ceiling construction of (n) partitions ceiling power and finishes. mep fire life safety and fire sprinlers shall be on another permit
4th - 6th fl consists of adding 19 phone booths and installation of life safety and seismic requirements in an existing office. path of travel and restroom accessibility upgrades up to 20% construction cost are included. deferred mep and fls
Suite 3120 ref pa # 2025-0411-4228: mech- new single duct vav boxes new water source heat pump new circulation condenser water pump & new ductwork & air distribution. electrical- power lighting & signal
19th fl- tenant improvement involves modification of (e) tenant suite to include selective demolish & construction of non load bearing partitions new & relocated light fixtures new doors/frames & glazing system. new & relocated millwork & new finishes. mep submittal deferred.(e) ste 1900 to be divided into 2 offices
9/fl- tenant improvement include demolish of non sturcutral partitions and ceiling. construction of (n) partitions celing power and finishes. mep/fire fire safety/fire sprinklers under another permit