×

We'll help you find the right contractor.

Share your project details and we'll reach out to Fmsprojects Inc so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Location and Projects

Address
5429 Telegraph Ave, Oakland, CA, 94609
Use our bidding system to request a quote

Fmsprojects Construction

FMSProjects, Inc. is a more distinct remodeler than most. We listen. We help to decipher what you really want and how we can best meet those needs. We are not always the lowest bid, yet we are committed to providing quality craftsmanship and have for over 30 years in the Bay Area. Our process focuses on personal attention to detail, professional management and stellar communication throughout the lifecycle of your project. We are confident that you will not only love the finished results but the journey we take together. Reach out today!

From BuildZoom: Fmsprojects Inc, 5429 Telegraph Ave, Oakland, CA (Employee: Frank Martin Silver) holds a General Building license and 2 other licenses according to the California license board.

Their BuildZoom score of 110 ranks in the top 4% of 336,931 California licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Fmsprojects Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Fmsprojects Inc Contact Information

Phone: (510) 547-6111
Address: 5429 Telegraph Ave, Oakland, CA 94609

Building Permits by Fmsprojects Inc

Sort by: Notable Notable | Date Date | Job Value Job Value
(rbc) - building residential combo alteration- 1 & 2 unit residential (building)
2019-11-26
Remodel (2) bathrooms at existing duplex including dry rot repair & stucco replacement at porch & garage. drx190554 (includes mechanical electrical plumbing) addresses 390 & 394 43rd street 5/14/2019 revision #1 additional dry rot repair window replacement & new footing
Valuation:
$77,000
Permit #:
RBC1901296
Status:
final
Fee:
$2,541
Permit Type:
N/A
Building Type:
N/A
(rbc) - building residential combo alteration- 1 & 2 unit residential (building)
2019-03-07
Completion permit related to rb0902515 re0902323 rp0901702 and rm0901090 to renovate main floor of interior. install new kitchen in (e) living room addition windows & remove old kitchen. seismic strengthening of west wall. new deck/stairs @ se corner meps included
Valuation:
$2,000
Permit #:
RBC1900250
Status:
final
Fee:
$391
Permit Type:
N/A
Building Type:
N/A
Residential building - alteration
2018-02-02
At lower level reconfigure family room to create bedroom and bathroom relocate laundry room main floor remodel kitchen remove fireplace/chimney enlarge rear door openings and reframe roof to raise ceiling height
Valuation:
$210,000
Permit #:
RB1604572
Status:
final
Fee:
$8,799
Permit Type:
N/A
Building Type:
N/A
(re) - electrical - 1 & 2 unit residential (building)
2018-02-02
Create 570 square foot accessory dwelling unit in lower level. all work to be done within the footprint of the existing structure. provide new landing and steps at entry door for this accessory dwelling unit. provide 1 hour fire rated separation between units which includes stc50 sound separation. this is existing habitable space being used for this secondary unit. kitchen being added... see more
Valuation:
$12,500
Permit #:
RE1604112
Status:
final
Fee:
$313
Permit Type:
N/A
Building Type:
N/A
(rm) - mechanical - 1 & 2 unit residential (building)
2018-02-02
Create 570 square foot accessory dwelling unit in lower level. all work to be done within the footprint of the existing structure. provide new landing and steps at entry door for this accessory dwelling unit. provide 1 hour fire rated separation between units which includes stc50 sound separation. this is existing habitable space being used for this secondary unit. kitchen being added... see more
Valuation:
$12,500
Permit #:
RM1602129
Status:
final
Fee:
$330
Permit Type:
N/A
Building Type:
N/A
(rp) plumbing - 1 & 2 unit residential (building)
2018-02-02
Create 570 square foot accessory dwelling unit in lower level. all work to be done within the footprint of the existing structure. provide new landing and steps at entry door for this accessory dwelling unit. provide 1 hour fire rated separation between units which includes stc50 sound separation. this is existing habitable space being used for this secondary unit. kitchen being added... see more
Valuation:
$12,500
Permit #:
RP1603131
Status:
final
Fee:
$270
Permit Type:
N/A
Building Type:
N/A
(rbc) - building residential combo alteration- 1 & 2 unit residential (building)
2018-11-30
To remove and repair drywall in family room of existing sfd.(including insulation replacement at location of repair. no change to wall layout.) to include mep electrical : lights switches etc
Valuation:
$9,000
Permit #:
RBC1800802
Status:
final
Fee:
$572
Permit Type:
N/A
Building Type:
N/A
Residential mechanical - addition
2019-03-05
Mechanical related to construct 218 sf addition to create master bedroom and 30 sf expansion of existing upper level deck at rear and kitchen and bathroom remodel at lower level. ds160446
Valuation:
N/A
Permit #:
RM1801070
Status:
final
Fee:
$645
Permit Type:
N/A
Building Type:
N/A
Residential plumbing - addition
2019-03-05
Plumbing related to construct 218 sf addition to create master bedroom and 30 sf expansion of existing upper level deck at rear and kitchen and bathroom remodel at lower level. ds160446
Valuation:
N/A
Permit #:
RP1801193
Status:
final
Fee:
$503
Permit Type:
N/A
Building Type:
N/A
Kitchen remodel & 177 sf addition new bathroom mudroom laundry and breakfast room. remodel existing bathroom at upper floor. no change to building height footprint or envelope. fire zone 2
Valuation:
$72,000
Permit #:
B2019-05370
Status:
final
Fee:
$4,116
Permit Type:
N/A
Building Type:
N/A
(rbc) - building residential combo alteration- 1 & 2 unit residential (building)
2019-11-14
Kitchen and (2) bathroom remodel including wall layout change and enlarging (1) rear bathroom window. includes mep (sub panel)
Valuation:
$90,000
Permit #:
RBC1901037
Status:
final
Fee:
$2,866
Permit Type:
N/A
Building Type:
N/A
(re) - electrical - 1 & 2 unit residential (building)
2018-11-28
Electrical related to kitchen laundry and dining room remodel in order to create open kitchen including alterations involving some windows and patio door at single family dwelling
Valuation:
N/A
Permit #:
RE1800581
Status:
final
Fee:
$207
Permit Type:
N/A
Building Type:
N/A
(rp) plumbing - 1 & 2 unit residential (building)
2018-11-28
Plumbing related to kitchen laundry and dining room remodel in order to create open kitchen including alterations involving some windows and patio door at single family dwelling
Valuation:
N/A
Permit #:
RP1800436
Status:
final
Fee:
$207
Permit Type:
N/A
Building Type:
N/A
Residential building - alteration
2018-02-09
Create 570 sqft accessory dwelling unit in lower level addressed as 5047cochrane. per drx170359
Valuation:
$12,500
Permit #:
RB1701013
Status:
final
Fee:
$2,494
Permit Type:
N/A
Building Type:
N/A
(rbc) - building residential combo alteration- 1 & 2 unit residential (building)
2021-08-04
Interior remodel for single family dwelling including relocating kitchen living and dining on main floor new bathroom powder room and office. scope also includes converting basement into 631 sf secondary unit. meps included. new unit to be addressed as 76 ross circle to construct new 3 162-sq.ft two-story single-family residence with 420 sqft attached garage and 5 bedrooms 4 bathrooms... see more
Valuation:
$250,000
Permit #:
RBC1902608
Status:
expired
Fee:
$14,864
Permit Type:
N/A
Building Type:
N/A
Residential plumbing - addition
2018-12-27
Plumbing addition and remodel
Valuation:
N/A
Permit #:
RP1701709
Status:
final
Fee:
$518
Permit Type:
N/A
Building Type:
N/A
Residential building - addition
2017-06-09
Construct 762 sq/ft rear addition with 1 new bed room 1.5 bathroom laundry and family room to an existing 2004 sq/ft single family dwelling create 278 sq/ft unconditioned work room under addition new master bedroom remodel (e) bedrooms and bathroom reduce the size of garage addition raised patio at left rear. ds170104
Valuation:
$370,000
Permit #:
RB1701081
Status:
final
Fee:
$16,513
Permit Type:
N/A
Building Type:
N/A
Residential plumbing - addition
2015-11-20
To complete rp1500719 : plumbing for 2-story addition enclose unconditioned porch 99 sf with walk-in closet above (99 sf); includes site work foundation. 10/01/14 revision #1: for conditioned space under porch area and remodel utility room
Valuation:
N/A
Permit #:
RP1503002
Status:
final
Fee:
$207
Permit Type:
N/A
Building Type:
N/A
Residential electrical - addition
2015-11-20
To complete re1500944 : electrical for 2-story addition enclose unconditioned porch 99 sf with walk-in closet above (99 sf); includes site work foundation. 10/01/14 revision #1: for conditioned space under porch area and remodel utility room
Valuation:
N/A
Permit #:
RE1503784
Status:
final
Fee:
$207
Permit Type:
N/A
Building Type:
N/A
Fill in corner w/kitchen addition (80.5sqft), two small dormers (98sqft) remodel kitchen (n) master bath, general remodeling (n) exterior doors & windows.
Valuation:
$250,000
Permit #:
B2016-01049
Status:
final
Fee:
$13,145
Permit Type:
Addition/Alteration
Building Type:
N/A

Fmsprojects Inc Reviews

BuildZoom hasn't received any reviews for Fmsprojects Inc. Click here to be alerted when reviews are posted about them.
Please write a review about Fmsprojects Inc
1 Rate this contractor
Click stars to rate
2 Provide a detailed review of this contractor.