Updated: May 06, 2026
Location and Projects
Address
New Hudson, MI, 48165
Use our bidding system to
request a quote
Generator Supercenter Electrician
Generator Supercenter, New Hudson, MI (Employee: Matt R Matznick) holds a Renovation license and 3 other licenses according to the Environmental Protection Agency license board.
Their BuildZoom score of 107 ranks in the top 6% of 167,179 Michigan licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Generator Supercenter, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Generator Supercenter Contact Information
Phone Number: (616) 202-6996
Edit
Do you work for this business? Unlock this free profile to update company info and see who's viewing your profile.
Generator Supercenter New Hudson
Quality
107
94th percentile
Pro tip:
We generally recommend hiring a contractor with a score higher than 95.
Generator Supercenter has a BuildZoom score of 107, which places them above 94% of 167,179 contractors in Michigan.
Activity
|
11 projects
|
2025 |
|
84 projects
|
2024 |
|
107 projects
|
2023 |
Our building permit records indicate that Generator Supercenter has worked on at least
202.0 projects over the past 3 years.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.
Experience
|
180 projects
|
Electrical projects |
Analyzing permits over the last 4 years shows that Generator Supercenter mostly works on
electrical project
projects.
Pricing
|
9 projects
|
$5k-$20k |
Pro tip:
For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.
Building Permits by Generator Supercenter
This is a sample of this contractor's permits. Click here to access their complete permit history.
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-1856
Status:
final
Fee:
$242
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-1670
Status:
final
Fee:
$165
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0399
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-2057
Status:
final
Fee:
$212
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0361
Status:
final
Fee:
$50
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-1826
Status:
final
Fee:
$135
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-0042
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
We would like to have electrical inspector meet us at the building to let us know how he would like us to do the electrical. the current electrical boxes are inside the building and there are many of them. some are not even in use any longer. there are just a few questions the electrician has in order to make sure we are doing what the inspector would like to see
Valuation:
N/A
Permit #:
PE 24-0102
Status:
final
Fee:
$115
Permit Type:
Remodel
Building Type:
N/A
Side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line
Valuation:
N/A
Permit #:
PGU22-0073
Status:
final
Fee:
$50
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-1668
Status:
final
Fee:
$165
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0360
Status:
final
Fee:
$50
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-1825
Status:
final
Fee:
$135
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-0699
Status:
final
Fee:
$180
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0150
Status:
final
Fee:
$50
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-0749
Status:
final
Fee:
$235
Permit Type:
Generator
Building Type:
N/A
Side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line
Valuation:
N/A
Permit #:
PGU22-0184
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE22-1162
Status:
final
Fee:
$212
Permit Type:
Generator
Building Type:
N/A
R - attached. install a generator at the side of the home in compliance with the 2015 michigan mechanical code the 2017 national electrical code and chapter 39 of the troy zoning ordinance
Valuation:
N/A
Permit #:
PB2022-0325
Status:
issued
Fee:
$30
Permit Type:
add/alter
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line
Valuation:
N/A
Permit #:
PGU22-0189
Status:
final
Fee:
$50
Permit Type:
Generator
Building Type:
N/A
Service panels 200-600 amps; kva units up to 20 (whole house generator)
Valuation:
N/A
Permit #:
PE230077
Status:
final
Fee:
$151
Permit Type:
Electrical
Building Type:
N/A
Similar Contractors See more
116
BZ Score
-
Avg Project
-
Projects
License # 2102206965
Auburn Hills, MI
120
BZ Score
$180K
Avg Project
-
Projects
125
BZ Score
$2.7K
Avg Project
-
Projects
Generator Supercenter Reviews
BuildZoom hasn't received any reviews for Generator Supercenter. Click here to be alerted when reviews are posted about them.
Recent Buildzoom Projects
Let us find you an electrician in your area today
We'll search our vast network of Electricians and connect
you with one that meets your needs today.
Verified License
BuildZoom confirmed this contractor's license
Generator Supercenter License info
Verified License
| License # | NAT-F233647-1 |
| Status | Active |
| Nation | Environmental Protection Agency |
| Type | Renovation |
- BuildZoom verified this license was active as of May 2026.
Verify this license's status for Generator Supercenter at the United States Environmental Protection Agency.
This is a sample of licensing data; click here to access a complete history.
Verified License
| License # | 6114590 |
| Status | Active |
| State | Michigan |
| Type | Electrical Contractor |
- BuildZoom verified this license was active as of February 2026.
Verify this license's status for Generator Supercenter at the Michigan Department of Licensing & Regulatory Affairs.
This is a sample of licensing data; click here to access a complete history.
License Not Required
| Status | Not Required |
- BuildZoom verified in August, 2021 that this contractor does not need a license to be a electrician in Michigan.
This is a sample of licensing data; click here to access a complete history.
Inactive License
| License # | CONT-216218 |
| Status | Inactive |
| City | Ann Arbor |
| Type | Contractor |
- According to the The City of Ann Arbor, MI, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Generator Supercenter at the The City of Ann Arbor, MI.
This is a sample of licensing data; click here to access a complete history.
107
BuildZoom Score
314
Permits
- Building permit records show that Generator Supercenter has worked on 314 permitted projects.
Generator Supercenter Employees
MM
Matt R Matznick