We'll help you find the right contractor.

Share your project details and we'll reach out to Gto Underground Utilities so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Is this your business? Claim now >
G

Location and Projects

Address
2533 STONEGATE DR, Seagoville, TX, 75159
Use our bidding system to request a quote

Gto Underground Utilities Construction

Gto Underground Utilities, 2533 Stonegate Dr, Seagoville, TX (Employee: Juan Martinez) holds a Pkwy Storm Drain license and 3 other licenses according to the Fort Worth license board.

Their BuildZoom score of 93 ranks in the top 27% of 222,249 Texas licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Gto Underground Utilities, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Gto Underground Utilities Contact Information

Phone: (469) 515-2300 Edit
Address: 2533 STONEGATE DR, Seagoville, TX 75159 Edit

Building Permits by Gto Underground Utilities

Sort by: Notable Notable | Date Date | Job Value Job Value
Right of way excavation permit -
2019-05-15
Right of way excavation permit - - work complete no cuts per felix ramirez 9/11/2019 *** original work dates may 22 2019 - jul 22 2019 extended on aug 08 2019****** original work dates may 22 2019 - jul 22 2019 re-activated on jul 16 2019***closed/complete- no cuts 07/12/2019 per felix ramirez new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench ... see more
Valuation:
N/A
Permit #:
2019-064386 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-06-21
Right of way excavation permit - - closed; complete; all work done behind curb; per; anthony city 08 13 19 . new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. contractor is future telecom. sub-contractors - horizontal drilling services and gto. maximum 2in x 2in pot hole per utility locate. project was permitting through general per... see more
Valuation:
N/A
Permit #:
2019-136194 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-06-21
Right of way excavation permit - - closed/expired referring to permit # 141836 covers same address covers house # 2100-2524. new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. contractor is future telecom. sub-contractors - horizontal drilling services and gto. maximum 2in x 2in pot hole per utility locate. project was permitted throug... see more
Valuation:
N/A
Permit #:
2019-136972 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-06-06
Right of way excavation permit - - closed; complete; work done behind curb; per; anthony city 08 21 19 . new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. sub-contractors - horizontal drilling services gto and bear utilities. maximum 2ft x 2ft pot hole per utility locate. only permitting for work along jamestown dr the rest has been... see more
Valuation:
N/A
Permit #:
2019-085668 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-05-22
Right of way excavation permit - - *** closed; complete; all work done behind curb; per; anthony city 08 05 19 . original work dates may 20 2019 - jul 05 2019 extended on jul 05 2019***gpp approved project (gp-2019-0089). new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. sub-contractors - horizontal drilling services gto and bear ut... see more
Valuation:
N/A
Permit #:
2019-070789 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-06-04
Right of way excavation permit - - 6/24/2020 chris davis close permit outdated *** original work dates jul 11 2019 - aug 09 2019 extended on sep 03 2019***don't extend w/o new subcontractor insurance (horizintal). *** original work dates jun 10 2019 - jul 10 2019 extended on jul 03 2019***telecom project placing hdpe conduit. working in conjunction with 2019 051603 000 00 ex right of ... see more
Valuation:
N/A
Permit #:
2019-051614 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-06-04
Right of way excavation permit - - 10/18/19 chris davis close ncf *** original work dates aug 10 2019 - aug 30 2019 extended on sep 10 2019****** original work dates jul 11 2019 - aug 09 2019 extended on aug 09 2019****** original work dates jun 10 2019 - jul 10 2019 extended on jul 03 2019***mastec conflict clearance info emailed 5/22 telecom project placing hdpe conduit. working in ... see more
Valuation:
N/A
Permit #:
2019-051603 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-22
Right of way excavation permit - - close complete no cuts 06/14/2019 per e.beltran *** original work dates apr 22 2019 - may 31 2019 extended on may 30 2019***new buried telcom project placing hdpe conduit. approved by gpp. 70'x1 street trench 4'x1 trench behind curb 241 bore under street. 2 bore pits 5'x5 **gto & hds are listed subcontractors for permitted work** - franchised utility
Valuation:
N/A
Permit #:
2019-058914 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-30
Right of way excavation permit - - closed; complete; no cuts found; per; anthony city 07/01/19 . *** original work dates may 01 2019 - may 31 2019 extended on may 30 2019***no work during any school hours may 13, 14, 15 during staar testing. (see attached coordination) no work allowed during posted school zone speed limit hours. please coordinate with pecan springs elementary school ... see more
Valuation:
N/A
Permit #:
2019-058888 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-22
Right of way excavation permit - - closed; complete; all work done behind curb; anthony city - 06/04/19 *** original work dates apr 22 2019 - may 31 2019 extended on may 30 2019***new telecom project placing hdpe conduit. approved by gpp. cameron rd: 17ft x 1 ft trench behind curb 5ft x 1ft sidewalk trench 265ft bore behind curb. two 5'x5 pits behind curb zayo-cameron rd & rundberg ln... see more
Valuation:
N/A
Permit #:
2019-055936 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-22
Right of way excavation permit - - closed complete ncf per; anthony city 05 14 19 . new telecom project placing hdpe conduit and connect to existing attach mh. approved by gpp. rundberg ln: 67ft x 1 ft trench behind curb 5ft x 1ft sidwalk trench 5ft x 1ft street trench. zayo-cameron rd & rundberg ln-col8 seg8n1 **hds and gto is listed as sub contractor for this permit** - franch... see more
Valuation:
N/A
Permit #:
2019-055935 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-02
Right of way excavation permit - - closed complete all work behind curb per; anthony city 05 10 19 . gto underground utilities will be sub on permit for bore.* izz 4/19/19 new buried telecom project approved by gpp. - col8seg6n1 permiting for portion along rutland dr braker ln is being permitted with txdot. 1049 lf of bore underneath sidewalk and 9 x 4 trench through sidewalk. ... see more
Valuation:
N/A
Permit #:
2019-043114 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Install new gas svc to new house open cut job 1-4 days only- atmos
Valuation:
N/A
Permit #:
26177
Status:
applied
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Right of way excavation permit -
2019-06-17
Right of way excavation permit - - closed; complete; refer to sketch; per; anthony city 08 21 19 . new buried telecom project placing hdpe conduit for fiber optic cable using trench methods across rutland dr. sub-contractors - horizontal drilling services and gto. maximum 2in x 2in pot hole per utility locate. 10'x1 trench behind curb 10'x1 s/w trench 2'x1 curb trench 50x'1 street t... see more
Valuation:
N/A
Permit #:
2019-134389 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-05-02
Right of way excavation permit - - closed/complete per felix ramirez 07?12/2019 *** original work dates may 06 2019 - jun 14 2019 extended on jun 11 2019***new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. approved by gpp. sub-contractors - horizontal drilling services gto and bear utilities. stassney ln: 156 bore behind curb 108'x1 t... see more
Valuation:
N/A
Permit #:
2019-064311 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-05-02
Right of way excavation permit - - closed/complete no cuts per felix ramirez 07/12/2019 *** original work dates may 06 2019 - jun 14 2019 extended on jun 11 2019***new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. approved by gpp. sub-contractors - horizontal drilling services gto. stassney ln: 156 bore behind curb 108'x1 trench behin... see more
Valuation:
N/A
Permit #:
2019-064310 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-05-02
Right of way excavation permit - - need inspector to authorize reopen to continue. 8/1/19 jc cl0sed/complete per felix ramirez 07/12/2019 *** original work dates may 06 2019 - jun 14 2019 extended on jun 11 2019***new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. approved by gpp. sub-contractors - horizontal drilling services gto. sta... see more
Valuation:
N/A
Permit #:
2019-064299 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-05-14
Right of way excavation permit - - closed; complete; work done behind curb; per; anthony city 08 13 19. new buried telecom project placing hdpe conduit for fiber optic cable using bore and trench methods. possible 6in diameter cut for potholing to locate utilities. au03125a sub-contractors - horizontal drilling services gto. 261 bore behind the curb 13'x1 trench behind curb. - franc... see more
Valuation:
N/A
Permit #:
2019-064245 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-26
Right of way excavation permit - - done 05-15-19 (no cuts) r.v. new buried telecom project placing hdpe conduit for fiber optic cable using boring and trench methods. 197 bore - behind curb 125'x1 trench behind curb 5'x1 sidewalk trench 1'x1 curb trench 200'x1 street trench. possible 6in diameter pothole for utility location. au01305c sub contractor: hds & gto & bear utilities - franc... see more
Valuation:
N/A
Permit #:
2019-064226 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A
Right of way excavation permit -
2019-04-25
Right of way excavation permit - - close complete no cuts 06/14/2019 per e.beltran *** original work dates apr 29 2019 - jun 01 2019 extended on jun 04 2019***this project involves the installation of underground fiber to be owned by zayo. boring will take place wb on hoffman dr crossing walsall loop and sb on struie ln crossing walsall loop. **permit is for crossing both intersection... see more
Valuation:
N/A
Permit #:
2019-064068 EX
Status:
final
Fee:
N/A
Permit Type:
Franchised utility
Building Type:
N/A

Similar Contractors See more

License # AEC16886
159
BZ Score
$25.8K
Avg Project
-
Projects
License # RB029034
152
BZ Score
$175K
Avg Project
-
Projects
License # AEC13852
180
BZ Score
$18.5K
Avg Project
-
Projects

Gto Underground Utilities Reviews

BuildZoom hasn't received any reviews for Gto Underground Utilities. Click here to be alerted when reviews are posted about them.
Please write a review about Gto Underground Utilities
1 Rate this contractor
Click stars to rate
2 Provide a detailed review of this contractor.