Share your project details and we'll reach out to
H R Wellington Construction Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
H R Wellington Construction Inc, 4722 Mission St, San Francisco, CA (Employees: Annette Marie Rocca, James William Hicks III, and Jeffrey James Rocca) holds a General Building license according to the California license board.
Their BuildZoom score of 86 does not rank in the top 50% of California contractors.
Their license was verified as active when we last checked. If you are thinking of hiring H R Wellington Construction Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Termite repair - item 10-a fungus damage to the rim joist extending to the firewall. replace and install new steel reinforced curb wall and/or properly raise concrete cap. repairs limited to 3 from right corner to base of the firewall
As per h.r.wellington report# 881701 dated 9/15/10 item 1b- fumgus & termite damage remove wood member replace with new in kind material ic- termite damage spray w/termiticide. 1f- fungus damage remove damage portions replace w/new material 1g- woodboring beetle fumigate area w/lethal gas
Items ib-door jambs are embeded cut up the base of the jambs & pack voids 48 fungus damage on portions of left side wooden stair board by board repl portions with in kind material no painting fence in fungus damage divorce fence w metal flashing
As per h.r. wellington report #882204 dated 9/23/11. item 3a: faulty grades have led to moisture penetration; fungus damage to foundation mudsills and lower wood framing members. cutup the base & the wall. remove all loose and deteriorated concrete. install a new steel reinforced curb wall
Item 9a as per h.r. wellington report #882229. fungus damages to sub floor framing below the center patio. remove existing concrete surface cut stucco to facilitate waterproofing. reinstall new concrete slab over new waterproof membrane. patch disturbed stucco to match
Repair as per h.r. wellington report #8818011 items #3a (see attached termit report). install temproary shoring cut studs install new mud sill with j bolts install #4 rebar and pour new foundation cap. max 12 high extension as per 881801
Repair as per h.r. wellington report #881721 items #1k, 1m, 3b & 3c (see attached termit report). 3c -cut studs install new p.t. mudsill with j bolts pour 8 foundation cap install temproary shoring max 12 high extension as per 881721
Repairs as per h.r. wellington report #881696 item no 3a 4b & 11a (see attached termit report). install temporary shoring cut studs install new mud sill with j bolts install #4 rebar and pour new foundation cap
Repair as per h.r. wellington report#880601 items no. 6a & 6a. (see attached termite report). right front corner to 3 out and left side of garage door: remove & replace stucco after repavring or replacing infected framing
Repair as per h.r. dwellington report no.#881087 item no.6a. remove 6 existing double hung wood window and replace with 6 marving wood double hund window to match existing (see attached termite report) u factor 67 max
As per h.r. wellington report #882204 dated 9/23/11. item 3a: faulty grades have led to moisture penetration; fungus damage to foundation mudsills and lower wood framing members. cutup the base & the wall. remove all loose and deteriorated concrete. install a new steel reinforced curb wall
Item 9a as per h.r. wellington report #882229. fungus damages to sub floor framing below the center patio. remove existing concrete surface cut stucco to facilitate waterproofing. reinstall new concrete slab over new waterproof membrane. patch disturbed stucco to match
As per h.r.wellington report# 881701 dated 9/15/10 item 1b- fumgus & termite damage remove wood member replace with new in kind material ic- termite damage spray w/termiticide. 1f- fungus damage remove damage portions replace w/new material 1g- woodboring beetle fumigate area w/lethal gas
Repair as per h.r. wellington report #8818011 items #3a (see attached termit report). install temproary shoring cut studs install new mud sill with j bolts install #4 rebar and pour new foundation cap. max 12 high extension as per 881801