Share your project details and we'll reach out to
Habitat for Humanity
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Habitat for Humanity at 900 JACKSON ST SUITE LLS -2E, Fairfield, IA 52556, held a General Contractor license (#C119081) with the Iowa contractors license board with an expiration date of 03-15-2018. We last verified the license was expired on 02-03-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 39,764 Iowa contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Building a 1 family 2 story frame dwelling. 1.5 bathrooms 3 bedrooms and no garage. east and west exterior walls to be 1 hr rated (ibc table 721.1(2)) with a maximum of 25% openings. unfinished basement with egress. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. 2021 irc
Building a 1 family 2 story frame dwelling. 1.5 bathrooms 3 bedrooms and no garage. unfinished basement with egress. wood framed open air front stoop with stairs to grade. engineered wood roof and floor trusses. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. 2021 irc
Remodel kitchen and 1st floor bathroom. electrical rewire and plumbing update. no change to layout. other trades require separate permits. smoke and carbon monoxide detectors required per code. all per city code
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. walk out egress provided- verify window size for future bedrooms. 2015 irc
Construct non load bearing walls in basement for bedroom and bathroom addition must have egress per code all all trades to pull seperate permits basements with habitable space and every sleeping room shall have at least one openable emergency escape and rescue opening. smoke and carbon monoxide detectors required per code. other trades require separate permits. all per 2015 internatio... see more
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with walk out and window egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window egress. 2015 irc
Replace existing deck with 10x14 ledgered deck. 2x8 ledger board attached to house. 2x8 joists spaced 16 oc supported by triple 2x8m beam on 12x42 piers with 6x6 posts spaced apprx 7 apart. approx less than 30 off the ground but will still use guard rails. stairs to grade with guardrails and handrail. 12 x 42 post footings required by code- must be inspected before concrete is poured.... see more
Replace 10x12 deck on rear of house with stairs to grade. construct a self-supported single level uncovered deck. (3) existing footings subject to field approval (previously inspected in 1997). 2x8 joists 12 on center supported on opposite bearing ends by double 2x8 beams. guards and hand rails per code. new stairs to grade to meet code. 12 x 42 post footings required by code- must be... see more
Remove deck and stairs. construct a new 5x6 uncovered self-supported deck on the rear of the house with stairs to grade. 2x8 joists 12 on center supported on opposite ends by doube 2x8 beams. at least (2) new footings. (2) exisitng footings to be field approved. 12 x 42 post footings required by code- must be inspected before concrete is poured. all per city code. 2015 ibc/irc
Remove rear door landing and stairs to grade. new 5x6 self-supported uncovered deck constructed with 2x8 joists 12 on center supported on opposite ends by double 2x8 beams. at least (2) new footings. (2) exisitng footings to be field approved for depth and diameter. 12 x 42 post footings required by code- must be inspected before concrete is poured. all per city code. 2015 ibc/irc
Building a 1 family 2 story 2x6 conventional frame dwelling. 2 bathrooms 4 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. finished basement with bedroom window and walk-out egress. 2015 irc
Building a 1 family 2 story 2x6 conventional frame dwelling. 2 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. finished basement with bedroom window and walk-out egress. 2015 irc
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with window and walk-out egress. 2015 irc
Front deck will measure 15 wide by 5'8 deep. this is replacing our typical concrete stoop. the back deck will be 5 by 5. again replacing the back concrete stoop. also remember this house will be built at the state fair and moved. the front deck will be built with the house. the back deck will be built after the house is in place. both will have frost depth footings
Building a 1 family 1 story 2x6 conventional frame dwelling. 1 bathrooms 3 bedrooms and no garage. smoke/carbon monoxide detection and bedroom egress windows required. treated sill plates and foundation bolts required. unfinished basement with walk-out and window egress. 2015 irc
According to the Iowa Workforce Development Agency, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Habitat for Humanity at the Iowa Workforce Development Agency.
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
C095715
Status
Inactive
State
Iowa
Type
General Contractor, Residential
Business Type
Corporation
According to the Iowa Workforce Development Agency, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Habitat for Humanity at the Iowa Workforce Development Agency.
This is a sample of licensing data; click here to access a complete history.