Independent Plumbing LLC, 2228 S Catarina, Chandler, AZ (Employees: Amos J Robinson, Craig Lee Miller, and Michael Gerrard Mazick) holds a Specialty Dual license and 2 other licenses according to the Arizona license board.
Their BuildZoom score of 110 ranks in the top 4% of 71,576 Arizona licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Independent Plumbing LLC, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Installation of roof mounted photovoltaic system 12.040 kw dc 11.500 kw air conditioning and installation of powerwall energy storage unit 13.5 kwh per approved plans **pursuant to sb 1446 a contractor has 30 days from date of permit issuance to obtain a current city business license. there will be no final inspections until license is current**
Installation of roof mounted photovoltaic system 11.610 kw dc 11.500 kw air conditioning and installation of powerwall energy storage unit 13.5 kwh per approved plans **adding to an existing solar system**
Effective building codes: 2024 ibc 2024 irc 2024 imc 2024 ipc 2024 upc 2024 ifgc 2024 ispsc 2023 nec 2018 phx fire code description of work: adding 10kw of battery storage to an existing photovoltaic system (rpv-23010970) 150amp derate hillside: no flood plain: no historic: no ***no new solar moudules shall be added all work subject to final field inspection and approval contact your ... see more
Effective building codes: 2024 ibc 2024 irc 2024 imc 2024 ipc 2024 upc 2024 ifgc 2024 ispsc 2023 nec 2018 phx fire code service upgrade per current electrical code reviewer: contact your electric service provider to verify any additional panel requirements description of work:
Adopted building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code service upgrade per current electrical code reviewer: contact your electric service provider to verify any additional panel requirements description of work:
Adopted building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code service upgrade per current electrical code reviewer: contact your electric service provider to verify any additional panel requirements description of work: installation of battery retrofitting to existing solar array approved on re 19005449 and interconnected to exis... see more
Effective building codes: 2024 ibc 2024 irc 2024 imc 2024 ipc 2024 upc 2024 ifgc 2024 ispsc 2023 nec 2018 phx fire code service upgrade per current electrical code reviewer: contact your electric service provider to verify any additional panel requirements description of work: (e) 200a main breaker to be derated to (n) 175a to allow backfeed of 60a
Effective building codes: 2024 ibc 2024 irc 2024 imc 2024 ipc 2024 upc 2024 ifgc 2024 ispsc 2023 nec 2018 phx fire code description of work: revised location of battery and mx disconnect on east wall refer to b - 1 2 & 7 reviewer: contact your electric service provider to verify any additional panel requirements
Adopted building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code scope of work: (e) 200a main breaker to be derated to (n) 175a to allow backfeed of 50a utility: srp hillside: no flood plain: no historic: no reviewers:
Adopted building codes: 2018 ibc 2018 irc 2018 imc 2018 ipc 2018 upc 2018 ifgc 2018 ispsc 2017 nec 2018 phx fire code scope of work: main electrical panel de-rated from 200amp to (n)175amps to allow backfeed of 60amp. rpv-25010473 for photovoltaic solar panels utility: hillside: no flood plain: no historic: no reviewers:
Scope of work: derate: (e) 200a main breaker to be derated to (n) 175a to allow backfeed of 60a solar panels permitted under rpv-25011587 effective building codes: 2018 irc 2018 ibc 2017 nec hillside: no floodplain: no reviewer(s): elect:
Installation of roof mounted photovoltaic system 15.050 kw dc 11.500 kw air conditioning and installation of powerwall energy storage unit 13.5 kwh per approved plans
Installation of roof mounted photovoltaic system 6.020 kw dc 5.760 kw air conditioning and installation of (1) solaredge energy storage unit 10 kwh and upgrade existing panel to new 200a solar ready panel per approved plans **adding to an existing solar system** **revision 6/9/2025 - panel model updated to mc4040s1200sc**
04/22/2025 - revision 2 to bld25-0305 \ removed photovoltaic meter and disconnect between new inverter and new backup loads panel. refer to pages pv-1 4 5 & 7
Installation of roof mounted photovoltaic system 25.370 kw dc 23.00 kw air conditioning and installation of (2) powerwall 3 unit 13.5 kwh per approved plans **10/10/2025 - extend permit for 180 days****revision 10/24/2025 - module type change to silfab sil-440 qd system size updated to 25.960 kw dc**
08/29/2025 - revision 1 to bld25-1953 \ der meter placement is incorrect. + battery tld + please place the dedicated der meter in the photovoltaic circuit. please see the 2b configuration
Installation of roof mounted photovoltaic system 13.860 kw dc 11.400 kw air conditioning and derate main breaker to 175a to allow backfeed of 60a per approved plans
BuildZoom verified this license was active as of August 2025.
Verify this license's status for Independent Plumbing LLC at the Arizona Registrar of Contractors.
This is a sample of licensing data; click here to access a complete history.
Verified License
License #
344062
Status
Active
State
Arizona
Type
Specialty Dual
Business Type
Llc
BuildZoom verified this license was active as of December 2025.
Verify this license's status for Independent Plumbing LLC at the Arizona Registrar of Contractors.
This is a sample of licensing data; click here to access a complete history.
License Not Verified
License #
266107
Status
Active
State
Arizona
Type
Plumbing
Class
Commercial
Business Type
Llc
When BuildZoom last verified this license, it had an expiration date of July, 2014. Check the current license status of Independent Plumbing LLC with the Arizona Registrar of Contractors
This is a sample of licensing data; click here to access a complete history.