×

We'll help you find the right contractor.

Share your project details and we'll reach out to Infrastructure Solutions so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Is this your business? Claim now >
I

Location and Projects

Address
Kansas City, MO, 00000
Use our bidding system to request a quote

Infrastructure Solutions Site Work Contractor

Infrastructure Solutions at Kansas City, MO 00000, has a BuildZoom score of 105 and ranks in the top 8% of 23,328 Missouri contractors.

If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.

Infrastructure Solutions Services

Start a project today:

Infrastructure Solutions Contact Information

Building Permits by Infrastructure Solutions

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-10-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-00209
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-01-20
No traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. if two-way directional traffic flow cannot be maintained contractor shall obtain traffic control permit via compass kc for work in roadway prior to performing excavation work. emergency watermain break for project 80002486 - emergency service clean-out
Valuation:
N/A
Permit #:
PW-EXC-2025-00207
Status:
approved
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-31
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03589
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-10-15
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03588
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-27
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03587
Status:
complete
Fee:
$1,217
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-08-27
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03586
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-09-23
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-03585
Status:
complete
Fee:
$171
Permit Type:
N/A
Building Type:
N/A
Street plate bridging
2025-05-13
Street plates can only be permitted for 21 days. after the 21 days daily penalty fees will be assessed until the plates are removed. wmr along prospect ave from e linwood blvd to e 63rd st (phase ii) kcmo proj.#80002222/9913
Valuation:
N/A
Permit #:
PW-SP-2025-00375
Status:
complete
Fee:
$30
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-19
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00068
Status:
complete
Fee:
$46,914
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-01-13
Bond will be used under the water agreement. no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. if two-way directional traffic flow cannot be maintained contractor shall obtain traffic control permit via compass kc for work in roadway prior to performing excavation work. this is a wmr for kcmo water services. this... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-02328
Status:
complete
Fee:
$25,377
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-02-26
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-05466
Status:
complete
Fee:
$1,002
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-01-17
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-05096
Status:
issued
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-03-07
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-05948
Status:
complete
Fee:
$7,003
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-04-16
Traffic control permit required for excavation work. water distribution emergency repairs kcmo project#80002486/9829-1 upgraded due to water leak
Valuation:
N/A
Permit #:
PW-EXC-2025-01487
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-29
Traffic control permit is required for excavation work. fy25 water distribution emergency repairs kcmo project#80002486/9829-1 pw-tc-2025-00650
Valuation:
N/A
Permit #:
PW-EXC-2025-01161
Status:
complete
Fee:
$167
Permit Type:
N/A
Building Type:
N/A
Traffic control permit for construction
2023-06-27
We will be installing watermain on ward pkwy from 63rd street to 64th street with ties in on w 63rd and w 64th street. we will not need to close the entire street and will be adhering to the 72 hour rolling timeframe. we will have traffic control in place to divert traffic around the open cut pavement
Valuation:
N/A
Permit #:
PW-TC-2023-01613
Status:
complete
Fee:
$279
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-09-12
Pw-tc-2023-02790- traffic control permit must be obtained before and during excavation work. we will be installing watermain on ward pkwy from 63rd street to 64th street with ties in on w 63rd and w 64th street. we will not need to close the entire street therefor we will be able to use our annual traffic permit pw-tc-2022-03014 adhering to the 72 hour rolling timeframe. we will have ... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-02790
Status:
complete
Fee:
$16,256
Permit Type:
N/A
Building Type:
N/A
Excavation for sanitary sewer
2023-08-03
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-00372
Status:
complete
Fee:
$1,395
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-03-07
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-05955
Status:
complete
Fee:
$4,557
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-04-19
Since work is on residential street and contractor has annual traffic control stickers no traffic control permit is necessary if contractor can complete work within 72 hours while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-05954
Status:
complete
Fee:
$334
Permit Type:
N/A
Building Type:
N/A

Similar Contractors See more

License # 11211-25
108
BZ Score
-
Avg Project
-
Projects
License # LIC-02-23-0047
112
BZ Score
-
Avg Project
-
Projects
License # NAT-F177794-2
108
BZ Score
-
Avg Project
-
Projects

Infrastructure Solutions Reviews

BuildZoom hasn't received any reviews for Infrastructure Solutions. Click here to be alerted when reviews are posted about them.
Please write a review about Infrastructure Solutions
1 Rate this contractor
Click stars to rate
2 Provide a detailed review of this contractor.