Share your project details and we'll reach out to
Ion Solar
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 107 ranks in the top 6% of 37,161 New Mexico licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Ion Solar, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Installation of utility interactive photovoltaic solar system 4.3 kw dc & 3.2 kw air conditioning photovoltaic solar array. install a new 125a interior flush mount load center directly adjacent to the existing main service panel. install a ground bar to isolate the grounds and neutrals if needed. amendment: bldr-2025-08366
Installation of utility interactive photovoltaic solar system 4.3 kw dc & 3.2 kw air conditioning photovoltaic solar array. install a new 125a interior flush mount load center directly adjacent to the existing main service panel. install a ground bar to isolate the grounds and neutrals if needed. amendment: bldr-2025-08366
Installation & integration of energy storage system energy storage unit(s): (2) enphase iq battery 5p power rating: 3.84 kw energy capacity: 5.0 kwh peak output power: 7.68 kw (3 seconds) 6.14 kw (10 seconds) mode of operation backup configuration: partial home backup
Meter pull required for installation 811 required: 811 call required for installation main panel: 100/125a - 12/24 (or larger) - main breaker load center nema 3r outdoor surface mount feeders: 2 awg se thwn-2 al. feeders - 25 (ft) ges: grounding electrode system update required surge protector: surge protector required
Temporary disconnect reconnect required for installation. the interconnection method shall be performed using a load side breaker-electrical service upgrade in the furthest slot from the main breaker as this will be the best method and per pnm requirement. the panel doesn't have one single main breaker since the wires from the meter feed into lugs therefore electrical service change r... see more
Install a new 200/175 surface mount single disconnect enclosure adjacent to the meter socket. ensure it meets proper clearance from the gas meter. run thhn from the socket to feed the new exterior main. run ser from the load side of the disconnect to feed the existing interior main isolate grounds and neutrals. install a new grounding electrode system with two ground rods at least 6 a... see more
Amendment for parent permit bldr-2024-07572: 1. exterior disconnect per utility company requirements is missing from plans. air conditioning disconnect was added to the system as per requirements. please see sheets v-2 s-3 and e-6 for primary changes
Installation of solar panels on existing residential roof. 4.73 kw. addition of 1 0-30a circuits. 11 panels. we will need to schedule a meter pull so that the service wiring can be redirected to the gateway 3 controller panel
Installation of solar panels on existing residential roof. 4.73 kw. addition of 1 0-30a circuits. 11 panels. we will need to schedule a meter pull so that the service wiring can be redirected to the gateway 3 controller panel
Submitted via css: installation of solar panels on existing residential roof. 4.73 kw. addition of 1 0-60a circuits. 11 panels. we will need to install a new 100/100 new main service disconnect panel on the outside of the home adjacent to the existing utility meter. meter pull required for energy storage system installation
Install a new 200/200 ug ringless meter/main approx. ~12’ to the right of the existing location. install a 100a/2p and run ser to feed the existing main service panel. isolate grounds and neutrals in the existing panel
Installation of solar panels on existing residential roof. 4.3kw dc. addition of 1 0-30a circuits. 10 panels. required for installation. electrical equipment damage. grounding electrode system update required
Upgrade electrical service from existing 200/200a to new 200/200a 120/240v single phase esc reason: electrical equipment location - violation present - meter only - working space clearance violation (nec 110.26) - gas meter obstruction
Submitted via css: installation of solar panels on existing residential roof. 3.96 kw. addition of 3 0-60a circuits. 9 panels. install (n) 200/200a load center adjacent to existing distribution panel
Submitted via css: installation of solar panels on existing residential roof. 3.96 kw. addition of 3 0-60a circuits. 9 panels. install (n) 200/200a load center adjacent to existing distribution panel
Submitted via email: parent permit: bldr-2025-07761. we have updated the description of the photovoltaic meter to match our installation. please see sheet e-7 for this change. other amendment permit: bldr-2025-08366
Submitted via email: parent permit: bldr-2025-07761. we have updated the description of the photovoltaic meter to match our installation. please see sheet e-7 for this change. other amendment permit: bldr-2025-08366