Share your project details and we'll reach out to
J C GENERAL CONTRACTORS INC
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
J C GENERAL CONTRACTORS INC, 20 Thune Ave, Moraga, CA (Employees: Ana Maria Ramirez and Jose Guadalupe Ramirez) holds a General Building, Electrical license according to the California license board.
Their BuildZoom score of 99 ranks in the top 15% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring J C GENERAL CONTRACTORS INC, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
1, 487 sqft one story addition to single family residence. interior remodeling including kitchen and bathroom exterior new siding. upgrades to mechenical electrical and plumbing systems
Remove and replace 9 windows and two existing patio doors two of the windows will be 6 inches taller to meet bedroom egress code all windows and doors will be install in existing framed openings
#scanned# install a new 22kw power backup generator outside residence to power sub panel including gas line to generator and 3 x 6 concrete pad resubmittal #1 - wcm - 11/14/19 - response to building comments. 3 copies resubmittal #2 - mss - 11/20/19 - response to building comments. 3 copies gate code call #481
Replacement of 9 (e) windows due to window failure. the replacement windows will be the same size & location as the (e) windows. wood interior aluminum exterior
Kitchen master bathroom and hallway bathroom remodel like for like. all work to be done at same time. new fixtures cabinets appliances. new recessed lights in kitchen master bathroom hallway bathroom laundry room and bedrooms
Unit 3w: remodel 1 bathroom in -kind: remove all interior finishes and replace with alike including bathroom fixtures. intsall new lighting andudate plumbing
Major remodel-addition to front and rear of existing home. garage addition reconfigure rooms throughout home all new windows lighting per plans 11-30-2012 -revision- replace window with a door on west elevation reconfigure roof and install vaulted ceiling in bedroom #1
Master bathroom & master closet guest closet remodel: remove exterior door at master bathroom and will be replaced with relocated window. window that was relocated will be in-filled. relocating toilet new fixtures glass shower panel gfci sink cabinets subfloor wall & tile. remove landing at master bathroom exit door
Remove and replace 9 windows and two existing patio doors two of the windows will be 6 inches taller to meet bedroom egress code all windows and doors will be install in existing framed openings
Remodel approx 1120 sf existing house including kitchen remodel bathroom vaulted ceiling new windows and relocating old windows electrical mechanical and plumbing work. 11-9-20: panel upgrade is included in the scope of work for this project
Replace 20 windows and 2 french doors at the rear of residence (size for size and bedroom windows must comply to the egress requirements) - replace decking boards and railings only on lower level deck off hobby/tv room - install new exterior stone vener to existing fireplaces - tear off existing roof and install new plywood if required 30 # felt and light weight tile roofing material
Remodel two bathroom remodel to remove and replace toilet sinks shower/tub and replace windows 3-windows (same size and same location) and reduce in size of 1-window with electrical plumbing and mechanical upgrades per plans
Replace 20 windows and 2 french doors at the rear of residence (size for size and bedroom windows must comply to the egress requirements) - replace decking boards and railings only on lower level deck off hobby/tv room - install new exterior stone vener to existing fireplaces - tear off existing roof and install new plywood if required 30 # felt and light weight tile roofing material
Remove and replace bathroom fixtures and wall & floor finishes. all fixtures to remain at (e) locations. no changes in bathroom layout. (bathroom at upper level)