Work category: 8p; pulling installation permit as the installers american air systems did not pull a permit to remove boiler serial number 31986. they then installed a lochinvar boiler serial #2130125278318. we are doing this to correct the information for the permit to operate boiler. this is not our work
Work category: 11p; permit #pp20080530118 has a correction notice for the installation of a double check backflow assembly. original installers put in an rp (higher protection). looking to final the original plumbing permit
Work category: 11p; installation of a new bypass backflow assembly. the assembly that was removed has a serial number of 4086770. the new serial number is: hc82034
Work category: 8p; discovered a 1989 installation that was installed by others who did not pull a plumbing permit for the job. we completed the application for a permit to operate boiler and it does meet the criteria and qualify for a pto. the boiler serial # is: 872b892680. this will also serve to satisfy item #3 on complaint# 202423747
Work category: 1p; replacement of the domestic hot water boiler serial #942m9954447. we are replacing with a laars mt2v0200 which is rated at 199, 000 btu's. there is an existing 119-gallon storage tank. therefore this unit no longer needs a pto and we will remove it from dbi's list following inspection
Work category: 11p; correction of violation. removal of backflow serial number ck1234. installation of a 4 length of pipe following the removal of the backflow. this is being done in conjunction with plumbing permit number pw20240111809 (510 bush st)
Work category: 11p; decommission of steam boiler identified as unknown 329. also decommission of backflow assembly serial number re862. the steam boiler will be removed from the pto list. the backflow will be removed from the sf puc list
Work category: 8p; replacement of the a.o. smith burkay hw-200 serial #942-f00-57568 and both storage tanks (119 & 90 gallon). installation of a new teledyne laars mt2v0200 hot water boiler and two 80-gallons insulated storage tanks
Emergency replacement of a 119-gallon storage tank. loosing multiple gallons of water. on completion please clear complaint number; 202538557. work on bottom floor
Work category: 8p; replacement of the raypak domestic hot water boiler serial #0902293746 with a teledyne laars domestic hot water boiler serial #c24326659
Work category: 11p; inspection of lee's sandwiches to remove nov for backflow that is no longer on the property. backflow serial number is w152567 which was last tested in 2017 per nov notice. the carbonator and backflow are no longer present. was located below small sink behind the main counter top. there ware abandoned soda lines below the sink
Work category: 1p; installation of a replacement steam boiler for a single family home. also installation of a new backflow prevention assembly with the de-commission of a 3/4 febco 825y serial #d8763
Work category: 1p; installation of a replacement domestic hot water system. this is a domestic hot water boiler and storage tank. it does not meet the criteria for a permit to operate boiler
Work category: 8p; installation of a replacement domestic hot water boiler. removal of boiler serial #i12h202320 and installation of a new lochinvar boiler serial number 2238130975943
Work category: 1p; replacement of a commercial water heater with a mt2v0200 boiler and 80-gallon stainless steel water heater. the boiler is 199, 000 btu's and does not meet the criteria for a permit to operate boiler
Work category: 1p; installation of a replacement 199, 000 btu domestic hot water boiler. due to the btu rating a permit to operate boiler is not required
Work category: 11p; while testing other assemblies found an existing backflow that had never been tested. checked with sf puc and it had never registered
Work category: 1p; installation of a new domestic hot water system. heater less than 200, 000btu input with a 119-gallon storage tank. does not require a pto