Location and Projects
Address
P O BOX 1857, Wailuku, HI, 96793
Use our bidding system to
request a quote
James KF Aruda Electrician
Their BuildZoom score of 0 does not rank in the top 50% of Hawaii contractors.
If you are thinking of hiring James KF Aruda, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
James KF Aruda Contact Information
Address: P O BOX 1857, Wailuku, HI 96793
Edit
Do you work for this business? Unlock this free profile to update company info and see who's viewing your profile.
This is a sample of this contractor's permits. Click here to access their complete permit history.
Project manago shane & chelsea scope main dwelling/garage/covered front entry - replacement main dwelling - four bedroom three & two half-bathroom dwelling w attached garage & covered front entry. dimensions 83'-0 x 38'-0 (overall) living 2, 052 sf garage 624 sf covered front entry 18 sf total 2, 694 sf fee summary underground service 1ph 3w 120/240v to 200a 1 feeder over 100a to 200a... see more
Valuation:
$260,510
Permit #:
E 20212452
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project matsumoto, patrice m scope main dwelling - addition over carport such as new bedroom new walk-in closet new bathroom #1 new 1/2 bathroom new family room new wet bar sink new covered lanai. electrical work to upgrade service equipment from 100a to 200a with feeders. electrical installation of receptacles switches luminaires. fee summary underground service 1ph 3w 120/240v to 20... see more
Valuation:
$90,000
Permit #:
E 20211581
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project voelker jeffrey & jennifer now occupied as dwelling/porch to be occupied as farm dwelling/porch/garage scope dwelling addition/alteration construct new garage addition & retaining wall. note proposed retaining wall is to be part of the foundation of the proposed garage addition and the front of the existing dwelling. fee summary 1 feeder not over 100a 9 lighting fixtures 6 swi... see more
Valuation:
$40,000
Permit #:
E 20210802
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project vu hoi scope main dwelling - reconstruct existing dwelling and addition decks - revamp 100a meco utility meter with a feeder. install light fixtures switches receptacle outlets. install new range/oven garbage disposal dishwasher laundry dryer water heater smoke detector devices. fee summary overhead service 1ph 3w 120/240v to 100a 1 feeder not over 100a 13 lighting fixtures 17... see more
Valuation:
$100,220
Permit #:
E 20192075
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project freitas bernadette scope main farm dwelling w attached carport - addition & alteration of the existing unfinished basement into a game room w closet living room w wet bar family room w closet full bathroom & storage room; construct a carport storage room & open deck; relocate an existing dwelling from tmk (2) 4-2-004019 connect it to the storage room & deck convert the kitchen... see more
Valuation:
$218,000
Permit #:
E 20182323
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project freitas bernadette scope main farm dwelling w attached carport - addition & alteration of the existing unfinished basement into a game room w closet living room w wet bar family room w closet full bathroom & storage room; construct a carport storage room & open deck; relocate an existing dwelling from tmk (2) 4-2-004019 connect it to the storage room & deck convert the kitchen... see more
Valuation:
$218,000
Permit #:
E 20182323
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project mirabai james (new owner since 3/31/2016) scope electrical alteration being done in kitchen living room bedroom #1 patio & exterior wall lights in existing 3 bedroom 1 1/2 bathroom dwelling built in 1978 fee summary 2 motors not over 1hp 19 lighting fixtures 12 switches 11 receptacle outlets 1 range hood 2 ceiling fans
Valuation:
N/A
Permit #:
E 20191344
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project montessori school scope upper elementary building - classrooms #1 & #3 additions - fire alarm. addtion of 560 sf to classroom #1 addition of 536 sf to classroom #3. electrical work includes new fire alarm devices added to exist. fire alarm system. fee summary 8 fire alarm device project electrical engineer jeral m. fukuda pe 10378-e
Valuation:
N/A
Permit #:
E 20191256
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project cymz sweet kre8tionz bakery scope building #6 unit #101 - new bakery equipment. electrical work includes new convection oven (vulcan vc4ed) mixer (hobort h600) and wall-mount exhaust fan (broan 509s). reference co-t2019/0041. fee summary 1 motor 12kw
Valuation:
N/A
Permit #:
E 20190877
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project hawaii sea spirits llc scope new warehouse (60'x125'). electrical work includes new panel fed by processing facility/office building (#b-2012/0784). new warehouse and emergency exit lighting. fee summary 1 feeder
Valuation:
N/A
Permit #:
E 20191619
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project chad bundy (new owner since 8/31/2018) scope upgrade service equipment from 100a to 200a with a feeder on existing main dwelling fee summary overhead service 1ph 3w 120/240v to 200a 1 feeder over 100a to 200a
Valuation:
N/A
Permit #:
E 20192746
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project keller, randy scope solar water heater installatio on anexisting 3 bedroom/3 bathroom dwelling built in 2003 fee summary 1 solar water heater 1 receptacle
Valuation:
N/A
Permit #:
E 20150423
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project vegas jody scope to construct an accessory dwelling and carport. electrical work to install a new 100a service equipment with a new feeder. install new receptacles switches luminaires smoke detectors range/oven disposal dryer water heater exhaust fan ceiling fans. install a new solar water heater fee summary underground service 1ph 3w 120/240v to 100a 1 feeder not over 100a 1 ... see more
Valuation:
$144,000
Permit #:
E 20181711
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project van der vlugt scope swimming pool fee summary 1 feeder not over 100a 1 motor not over 1hp 2 lighting fixtures 1 switch
Valuation:
$55,000
Permit #:
E 20200599
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project adventure park maui - equipment trailer scope converting trailer container to storage bathroom. electrical work includes new feeder tap to panelboard. new branch circuits for lighting receptacle outlets & exhaust fan fee summary 1 feeder 100a & under 1 lighting branch circuit 1 receptacle branch circuit 1 motor not over 1 hp. plans in ax under this permit. project electrical e... see more
Valuation:
N/A
Permit #:
E 20190949
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project adventure park maui - check-in trailer scope converting trailer container to office ada bathroom. electrical work includes new 200a 120/240v 1ph 3w underground service to service pedestal at north-east corner of property underground feeder to pullbox at trailer with feeder tap to panelboard. new branch circuits for lighting receptacle outlets air conditioning unit. fee summary... see more
Valuation:
N/A
Permit #:
E 20190911
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project christina & arthur lee (new owner since 4/4/2017) scope revamp 200a meter combo service equipment on existing 3 bedroom 1 bathroom dwelling built in 1978 fee summary underground service 1ph 3w 120/240v to 200a
Valuation:
N/A
Permit #:
E 20181890
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project maui lani golf course - electric vehicle charging stations scope 1 ea level 2 electric vehicle charging station & 2 ea level 3 electric vehicle charging stations converter kiosk security camera & service equipment in the south side of the golf course clubhouse parking lot. electrical work includes new 300a 208y/120v 3 ph 4w underground service to new pedestal. feeders to 2 pan... see more
Valuation:
N/A
Permit #:
E 20160691
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project haiku community center scope electric vehicle charging stations. electrical work includes new 200a-480y/277v-3ph-4w service installation. new 480v panelboard. new 240v panelboard via 15-kva transformer. (3) new electric vehicle charging stations (hitachi hi-qcul) (2) l3 (480v) and (1) l2 (240v). 1 new meco meter. county cip project - electrical permit fees exempt. fee summary ... see more
Valuation:
N/A
Permit #:
E 20160478
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Project nestor f yanos scope new grid-tied photovoltaic solar power system which consist of 2 arrays for a total of 34-280 watt solar world modules with 34-250 watt enphase micro-inverter. array #1 17-280 watt solar world modules with 17-250 watt enphase micro-inverter. array #2 17-280 watt solar world modules with 17-250 watt enphase micro-inverter. panels & enphase inverters mounted... see more
Valuation:
N/A
Permit #:
E 20154655
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Similar Contractors See more
122
BZ Score
$4.1K
Avg Project
-
Projects
132
BZ Score
$3.2K
Avg Project
-
Projects
126
BZ Score
$29K
Avg Project
-
Projects
James KF Aruda Reviews
BuildZoom hasn't received any reviews for James KF Aruda. Click here to be alerted when reviews are posted about them.
Recent Buildzoom Projects
Let us find you an electrician in your area today
We'll search our vast network of Electricians and connect
you with one that meets your needs today.
James KF Aruda License info
License Not Verified
| License # | CT-23045 |
| Status | Active |
| State | Hawaii |
| Type | Electrical |
| Business Type | Individual |
- When BuildZoom last verified this license, it had an expiration date of September, 2018. Check the current license status of James KF Aruda with the Hawaii Department of Commerce & Consumer Affairs
This is a sample of licensing data; click here to access a complete history.
License Not Verified
| License # | CT-23045 |
| Status | Active |
| State | Hawaii |
| Type | Electrical Contractor |
| Business Type | Individual |
- When BuildZoom last verified this license, it had an expiration date of September, 2022. Check the current license status of James KF Aruda with the Hawaii Department of Commerce & Consumer Affairs
This is a sample of licensing data; click here to access a complete history.
ALERT*
BuildZoom Score
- How the BuildZoom Score works
- *No active license on file. If you are James KF Aruda, click “This is My Business” to update your information.
2.1K
Permits
- Building permit records show that James KF Aruda has worked on 2146 permitted projects.