Share your project details and we'll reach out to
James Tully
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Serving Whitman, Massachusetts and the surrounding area, James Tully brings three decades of experience to residential construction projects. Over 30 years in the industry, he has managed home improvements and repairs tailored to the needs of local homeowners. His project portfolio includes renovations and general contracting services on single-family properties in Whitman and nearby communities. With longstanding roots in the region, Tully applies his knowledge of area building codes and standards to ensure that each project meets local requirements. Whether managing interior updates or exterior repairs, he offers practical solutions based on years of hands-on involvement in construction throughout southeastern Massachusetts.
Factset - 9th floor -; interior office renovations.; work to include : selective removal of finishes new architectural finishes such as gwb partitions flooring paint glazing act and millwork.; minor structural infill to 10th floor.; modify existing mepâs fire alarm and sprinkler systems as required.; ;e- plans
Analog photonics - 2nd floor -; interior office renovation on the 2nd floor to include: selective removal of finishes millwork dfh glazing drywall act flooring painting etc.;renovation also includes new mep systems (fire protection hvac electrical etc.) and structural steel reinforcement for tenant equipment. e- plans
Interior office renovation on the basement level to include: selective removal of finishes dfh drywall flooring painting etc. renovation also includes selective removal of existing mep and install of new mep systems (fire protection hvac electrical etc.).eplan;
Interior renovation of existing office space on the 18th floor at 28 state street to include selective removal of finishes new architectural finishes such as gwb flooring paint act and minor mep upgrades. no new fire alarm or sprinkler work included
Interior office renovation on the 12th floor at 500 boylston street to include selective removal of flooring new flooring installation and minor paint touch up. no sprinkler or fire alarm work included
Interior office renovation on the 15th floor at 699 boylston street to include selective removal of finishes new architectural finishes including drywall and paint minor upgrades to existing mepâs. no new fire alarm or sprinkler work included
Landmark center - operations and conference center;- 2nd floor -; interior office tenant fit-out.; work;to include :; all new architectural finishes new;gwb partitions millwork new lighting flooring paint and;act.;;mep hvac fire alarm &; sprinkler;upgrades for space.;
Interior renovation on the 8th floor (suite 820e) at one design center pl (21 drydock ave) to include selective removal of finishes new architectural finishes such as gwb partitions flooring paint act and minor mep upgrades. no fire alarm or sprinkler work included
Interior office renovation on the 8th floor at 45 milk street to include selective removal of finishes new architectural finishes such as drywall partitions flooring and paint. no new sprinkler or fire alarm work included
Interior fit-out on the 6th and 7th floors at 9 channel center street to include selective removal of finishes new architectural finishes such as gwb partitions millwork flooring glass paint act and mep upgrades
Interior renovation of existing office space on the 36th floor at one post office square to include selective removal of finishes new architectural finishes such as gwb flooring paint act and minor mep upgrades. no fire alarm or sprinkler work included
Selective;removal of;existing finishes on the 4th 7th and 28th floors at 99 high street. includes painting and patching as necessary. no new sprinkler or fire alarm work included
Interior office fit-out on the 28th floor at 99 high street to include new architectural finishes such as gwb partitions millwork glazing flooring paint act and mep upgrades
Interior office renovation on the 6th floor of 500 boylston street to include selective removal of finishes new plumbing fixtures and new carpet. no fire alarm or sprinkler work included
Interior office renovations on the 12th floor at 200 state street to include selective removal of finishes new architectural finishes such as gwb partitions paint act and minor mep upgrades