Share your project details and we'll reach out to
Levin Benjamin
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Levin Benjamin at 2654 VICTORIA DR, Laguna Beach, CA 92651, held a Architect license (#C21119) with the California contractors license board with an expiration date of 04-30-2023. We last verified the license was inactive on 06-19-2025.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Office ti: demolish of existing office space on 9th floor construction of new office space on the 9th floor restroom upgrades on the 9th floor new finishes on the 9th floor. 2
Interior tenant improvement on the 4th floor to include new partitions and finishes to create new office spaces and conference rooms. conference rooms will be used/occuppied by building occupants and their guests only. work is approximately 7917 sf. no change in use or parking
Interior alterations to convert portion of existing tenant spaces into new building management office and new common areas: bikeroom toilet rooms security desk| convert portion existing corridor into new storage room| new wall finishes and partial ceiling
Nonstructural tenant improvement. to demo/construct nonbearing interior partitions and to change demising wall location between suite #840 & #850. enlarge size of suite #840 to approx. 1198 s.f. and reduce size of suite #850 to approx. 753 s.f
T. i. chg of use from restaurant to office ( suite gr 936 & 290 ); new offices t-bar clg install new elevator shaft create new parking stalls at p1 level due to removal of elevator shaft and roof top equipments and screens
Tenant improvement (e) office space: (n) interior non-bearing walls ceiling systems millwork and finishes to create offices restrooms conference rooms and storage. includes exterior opening and in-fill of (e) exterior window. (16, 600 sf)
Full floor tenant improvement to create offices conference rooms restrooms call center and storage rooms. includes interior non-bearing walls ceiling systems millwork and finishes. (63 360 sf) change of use from whole sale to office
Tenant improvement. remodel - demolish & construct. non bearing interior partitions on the entire second floor lounge. remodel mens and womens restrrom. addition gypsum board ceiling
Installation of speaker system & speaker system supports at (e) auditorium (405 max occupancy). all work per engineer's design. no added floor area. no change of plot plan
Change of use from gift shop to flower shop. no changes in parking or occupancy. upgrade existing bathroom for h.c. accessibility new interior nonbearing partitions replace drywall on (e) walls t-bar ceiling to repair.(1-st floor 564sqft, )
Proposed tenant improvement on the 14th floor suite 1400 consisting of creating new office rooms by installing non-bearing partitions new ceiling assembly (~1200 sqft) new 45min. door at elevator lobby and related surfaces finishes
Interior early start demolition per p/bc 2014-097 on floors 3 4 6 and 7. demolish non-load baering interior partitions. no change to fire life safety systems or plumbing fixtures
Proposed 4332 sqft tenant improvement on the 10th floor suite 1060 creating new office rooms by installing non-bearing partitions and related surfaces finishes. install new suspended ceiling assembly in a 15'x22 area only
Non-structural tenant improvement to 6th floor of (e) office building: upgrade (e) restrooms & reduce number of water closets by one in each of women's restrooms & urinals in each of men's restrooms
Tenant improvement. remodel suite new demising walls. new interior non-bearing partitions & rework of suspended ceiling. suite = 4354 usf remodel area = 3000 usf
According to the California Architect License Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Levin Benjamin at the California Architect License Board.
This is a sample of licensing data; click here to access a complete history.