Share your project details and we'll reach out to
Magnum Drywall Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Their BuildZoom score of 100 ranks in the top 13% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Magnum Drywall Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Apple tenant improvement. - 2nd floor reconfiguration to labs & office space. addition (n) mechanical unit on roof top rev # 1 - remove transformer from (e) scope of work - issued 9/29/14 deferred #1- accessible path of travel restroom ada mechanical duct hanger- issd otc 9/4/2014
Apple- commercial. tenant improvement to fitness lab 12, 858 sq ft to include m, e, p's revision # 2 - changes to proposed electrical room & i.d.f. room (server rm) - issued 2/27/2014 deferred # 1 - installation of enlarged exercise rooms - issued 2/27/2014 rev # 1 change layout addition mechanical equipment with structural upgrades to support. -issued 1/9/14 file/plans in boxes in th... see more
Apple- comm.t.i 7208 sq ft to include removal of (e) partitions & construct (n) partitions to create (n) work space revision #2 ada improvements at path of travel- issd otc 6/24/2014 revision #1- create (n) door at stair #2 enclosure in vestibule- issd otc 10/30/2013 deferred #1- details for anchorage for loft partitions walls -issd otc 10/30/2013
Apple - southwest portion of 3rd floor (6464 sf). interior tenant improvement. to complete office & lab spaces addition conference rooms & break rooms. (e) mep's & fire systems will be modified tco good till 7/4/2014 revision #1- reconfigure (2) rooms and removal of (1) room- issd otc 10/24/2013
Apple - first floor - commercial tenant improvement (3178 sqft)consist of demolition of partitions and new reconfigurated partition walls & work stations include electrical, mechanical; no plumbing tco good thru 4/13/13 3/5/13 revision #3 update accessible stalls & sidewalk at east entrance-issued 3/5/13 rev # 2 issued over-the-counter on 2/28/2013 12/4/12-deferred #1- addition storef... see more
Apple - commercial tenant improvement in existing office building (5590 sqft) 5/14/2013-revision # 2- revise 416 sq ft to westside restroom remove existing hallway in beads blast room-iss otc revision #1- revise restroom showers remove and addition new e, m w minor structural-issd otc 3/26/2013
Apple - north portion of 3rd floor 13854sf. interior tenant improvement. to complete office & lab spaces addition conference rooms & break rooms. (e) mep's & fire systems will be modified- tenant improvement prep #13010061 5/30/2013- revision #1- removing walls to 400 sq ft from scope of work-issd otc 5/30/2013
Apple - tenant improvement. renovation of lab space with mechanical & electrical (t.i. prep was 13100199) deferred #1- balcony upgrades to meet ada accessibility- issd otc 1/16/2014 file/plans in boxes in flea room for february 2014
Apple-phase 10-commercial tenant improvement (3112sqft)interior and exterior work interior demoliton work is under permit #12020013.scope of this permit includes interior non bearing partition walls finishes and exterior patio rev #1- tenant improvement. to include new load bearing partitions ceiling and associated finishes on a portion of the 1st floor of (e) office- issd 7/13/12 ten... see more
Commercial tenant improvement. on the 1st floor-6, 438 sq ft to include new office & storage partitions new hvac distribution electrical lighting. interior demolish of partitions & ceilings.no exterior work 4/11/2012 -rev#1- revise floor layout at 1st floor issued 6/21/12 assoc permit-ti prep(12030109) files scanned box 467 *see notes
Rite aid-new 18 203sqft retail building located in a parking area of homestead square retail center. also included is the construction of new parking lot with site lightng & landscaping including a new trash enclosure (new addr 20572 homestead changed from 20580 homestead) 1/17/13- refunded tco bond 10 000.00 tco good thru 1/4/2013 12/7/11 deferred submittal #1 metal canapies for exte... see more
Apple - first floor - commercial tenant improvement (51 092sqft) office space includes lab storage break areas & conference spaces 4/18/12 deferred #2 installation of radio frequency shield for chambers-issd 5/3/12 1/23/22012-def#1-deferred shelving system in storage lab room 117-issued 4/18/12
Drywall, General Building, Suspended Ceilings, Painting And Decorating, Prefabricated Equipment, Lathing And Plastering, Window Coverings
Business Type
Corporation
BuildZoom verified this license was active as of June 2026.
Verify this license's status for Magnum Drywall Inc at the California Contractors State License Board.
This is a sample of licensing data; click here to access a complete history.
License Not Verified
License #
73461
Status
Active
State
Nevada
Type
C-4b - Wallcovering
Business Type
Corporation
When BuildZoom last verified this license, it had an expiration date of July, 2015. Check the current license status of Magnum Drywall Inc with the Nevada State Contractors Board
This is a sample of licensing data; click here to access a complete history.
Inactive License
License #
0073461
Status
Inactive
State
Nevada
Type
C 4 Painting And Decorating
Business Type
Corporation
According to the Nevada State Contractors Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Magnum Drywall Inc at the Nevada State Contractors Board.
This is a sample of licensing data; click here to access a complete history.