Mark D Fiorino
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Mark D Fiorino at Foxboro, MA 02035, held a General Contractor license (#CS-082744) with the Massachusetts contractors license board with an expiration date of 05-19-2022. We last verified the license was inactive on 04-29-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 139,240 Massachusetts contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
Bgo spec suite - 3rd floor -; tenant building out.; work includes :; demolish existing space new drywall partitions act new lighting millwork and all new architectural finishes.; modifications to existing mep fire alarm and sprinkler systems.;;
Mcmullen museum - 1st floor renovation includes cut and patch to install low voltage sleeves remove doors and infill relocate outlets remove buried sprinkler heads paint and finishes ; all work to be verified in the field by ward inspector
Office retail school florist health club restaurant#36a parking repair garage service station motor vehicle rentals/storage bank barber shop child care &;43 ; dentist;temporary certificate for offices; 22nd floor expires 7/6/23 pending completion of phase 2;alt1408487 issued 11/4/2022
Hotel garage ballroom exhibition hall restaurant/lounge health club and wireless communications;certificate for hotel -two additional guest rooms on 28th floor &; common areas guest rooms floors 2nd -38th floors;alt 1260286 issued 1/6/22
Addition restaurant w seating to occupancy - atrium - 1st floor -; new food &; beverage station within main atrium space work includes new drywall electrical/fire alarm plumbing sprinkler food service equipment &; finishes
Ecg - 19th floor -; office tenant fit out.; work includes : demolish existing space. new drywall mep work fire alarm and sprinkler work.; all new millwork and finish work
Sidley austin - 36 &; 37th floors -; office tenant renovations.; work on the 36th floor will be minor in scope.; work on the 37th floor will be a full fit-out.; ;work includes: demolish drywall partitions new lighting act millwork and all new finishes.; modifications to existing mep hvac fire alarm and sprinkler systems
Morgan stanley;- 14th - 21st floors -; tenant fitout of new offices with a new interconnecting stair.; work includes : new drywall partitions act new lighting millwork and all new architectural finishes.; new structural work to install interconnecting stair.; modify existing mep fire alarm and sprinkler systems
Amenity space - 8th floor -; building out of a new amenity space for building tenants. buildout of new conference room management office &; fitness area installation of new locker rooms and bathrooms.;;work includes :; minor demolish ;new drywall new lighting new tile act carpeting millwork and all finish work.; modify existing mep fire alarm and sprinkler systems.; ;change occupancy ... see more
Change of occupancy to increase two additional guest rooms on 28th floor removing club lounge - from 1149 to 1151 guestrooms. work consists of renovation to 1151 guest rooms and 33 corridors removal of tubs to showers in 890 rooms- tub remains in other 259. work includes new finishes new furniture throughout - corridors scope new carpet paint &; wall cover. [eplan]
Oxford corporate office - 12th floor -; ;office fit-up.; work includes :; demolish of existing space new drywall new lighting act and all new millwork and finishes.;;modifications to existing mep fire alarm and fire sprinkler systems.; ;e- plans
Cove hill partners expansion - 14th floor -; office tenant fit out.; work includes : demolish existing space new drywall new lighting act millwork and all new finish work.; mep hvac fire alarm and sprinkler alterations per plans
Atea pharmaceuticals -; 21st floor; -;;;office fit-up.; work to include :; minor demolish new drywall new lighting act millwork and all finish work.;;modify existing mep fire alarm and sprinkler systems.;e- plans
Glossier retail - 1st floor building out of new retail location work includes drywall partition electrical/fire alarm sprinkler plumbing hvac finish work.building is landmark and expect from commercial check
Starr boston - 11th floor -; office fit-up.; work to include :; minor demolish new drywall new lighting act millwork and all finish work.; modify existing mep fire alarm and sprinkler systems.; e- plans
Bank of america - 4 8 15 16 &; 17th floors -; renovation of full office buildout to existing shell space.; work involves but not limited to :; new drywall electrical/fire alarm sprinkler plumbing hvac and all finish work.; structural work to install a new interconnecting stair between floors 15 and 16.; ; ; ; ; ; ;
Lobby mezzanine -; replace lighting w new led lights replace carpet new replace act ceiling w new relocate existing fire alarm &; sprinkler heads for new layout paint and new ceramic tile at security desk replace existing fcu;;;;;;;;;;;;; e- plans
New balance retail - 1st floor -; retail tenant fit out.; work includes : demolish existing space new drywall electrical/fa sprinkler plumbing hvac &; all finish work
According to the Massachusetts Department of Public Safety, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Mark D Fiorino at the Massachusetts Department of Public Safety.
This is a sample of licensing data; click here to access a complete history.