Mci Metro Access Transmission Site Work Contractor
Mci Metro Access Transmission at 2175 N CALIFORNIA BLVD STE 975, Walnut Creek, CA 94596, held a Site Work Contractor license (#574787) with the California contractors license board with an expiration date of 08-31-1993. We last verified the license was expired on 11-30-2025.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 336,931 California contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our project planner to be easily matched to qualified, licensed professionals in your area.
(eplan)loc: barranca/redhill. access fiber manhole/vault for purpose of investigating available duct. place fiber optic cable thru ug conduit from fiber manhole/vault traffic control to assist with construction. duration of work:5 days
(eplan)loc: barranca/redhill. access fiber manhole/vault for purpose of investigating available duct. place fiber optic cable thru ug conduit from fiber manhole/vault traffic control to assist with construction. duration of work:5 days
(eplan) location: alton/jamboree. excavation for the installation of fiber optic cable in conduit; tie-in to existing xo vault. traffic control to assist with construction. duration of work: (5) days
(eplan) location: alton/jamboree. excavation for the installation of fiber optic cable in conduit; tie-in to existing xo vault. traffic control to assist with construction. duration of work: (5) days
Verizon/mci network maintenance. fiber splicing will take place at cable vaults located on site walk adjacent to each one of these addresses. temprorary encroachment of the sidewalk and shoulder/bike lane will be required while work is being performed. there are a total of 4 splice locations associated with this project
(eplan) location: irvine center from pacifica to research. access existing vaults for removal & replacing fiber optic cable. traffic control to asst with construction. duration of work:(10) days. *emergency permit*
(eplan) location:bryan/culver- excavation for the installation of fiber optic cable in conduit; placement of (7) mci vaults.traffic control to assist with construction. duration of work: (10) days. *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
(eplan) location: irvine/lambert. access existing fiber manhole/vault for purpose of investigating available duct. place fiber optic cable thru existing ug conduit from existing fiber manhole/vault. traffic control to assist with construction. duration of work:5 days. *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
(eplan) location: el camino real/jamboree. access fiber vaults to investigate available duct. place fiber optic cable thru existing ug conduit from existing fiber vaults. traffic control to assist with construction. duration of work: (15) days. *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
(eplan) location: el camino real/jamboree. access fiber vaults to investigate available duct. place fiber optic cable thru existing ug conduit from existing fiber vaults. traffic control to assist with construction. duration of work: (15) days
(eplan) location: main/von karman. access existing fiber manhole/vault for the purpose of investigating available duct. place fiber optic cable thru existing ug conduit from existing fiber manhole/vault. traffic control to assist with construction. *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
(eplan) location: main/von karman. access existing fiber manhole/vault for the purpose of investigating available duct. place fiber optic cable thru existing ug conduit from existing fiber manhole/vault. traffic control to assist with construction
(eplan) location: culver and 405frwy. excavation for the installation of fiber optic cable in conduit; placement of (2) mci vaults.traffic control to assist with construction duration of work: (10) days *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
(eplan) location: culver and 405frwy. excavation for the installation of fiber optic cable in conduit; placement of (2) mci vaults.traffic control to assist with construction duration of work: (10) days
(eplan) location: jamboree/main. excavation for install of fiber optic cable in conduit; placement of 1 mci vault. traffic control to assist with construction. duration of work: (5) days
(eplan) location: jamboree/main. excavation for install of fiber optic cable in conduit; placement of 1 mci vault. traffic control to assist with construction. duration of work: (5) days
(eplan) location: alton/murphy. access fiber manhole/vault to investigate available duct. place fiber optic cable thru ug conduit from fiber manhole/vault. traffic control to asst w/construction. duration of work: (5) days
(eplan) walnut ave & the mall-602-tusmtso-s104r-irv - vz_las_0000655r access existing fiber manhole/vault for the purpose of investigating available duct. placement of fiber optic cable through existing underground conduit from existing fiber manhole/vault. duration of work: (10) days
(eplan) location: von karman & campus - access existing fiber manhole/vault for the purpose of investigating available duct. placement of fiber optic cable through existing nderground conduit from existing fiber manhole/vault. duration 4 days. *pre-con meeting with inspector required before start of work. call 949-724-6329 to schedule*
According to the California Contractors State License Board, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Mci Metro Access Transmission at the California Contractors State License Board.