×

Don't wait to get an Electrician

We make finding an electrician fast, easy, and commitment-free.

Call now (623) 259-4111
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
8981 Winter Cove Dr., Commerce Township, MI, 48382
Use our bidding system to request a quote

Metro Electric

Their BuildZoom score of 108 ranks in the top 5% of 167,179 Michigan licensed contractors.

If you are thinking of hiring Metro Electric, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Metro Electric Services

Start a project today:

Metro Electric Contact Information

Phone: (248) 360-4960 Edit
Address: 8981 Winter Cove Dr., Commerce Twp., MI 48382 Edit

Metro Electric Commerce Twp.

Quality

108
95th percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Metro Electric has a BuildZoom score of 108, which places them above 95% of 167,179 contractors in Michigan.

Activity

74 projects
2025
188 projects
2024
101 projects
2023
Our building permit records indicate that Metro Electric has worked on at least 363.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

6 projects
Home Additions
340 projects
Electrical projects
Analyzing permits over the last 4 years shows that Metro Electric mostly works on electrical project and home addition projects.

Pricing

6 projects
$5k-$20k
Value Not Public: 340.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Metro Electric

Sort by: Notable Notable | Date Date | Job Value Job Value
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical ... see more
Valuation:
N/A
Permit #:
PM25-0410
Status:
issued
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-1565
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical ... see more
Valuation:
N/A
Permit #:
PGU25-0054
Status:
issued
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical ... see more
Valuation:
N/A
Permit #:
PE25-0499
Status:
issued
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 5 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-1697
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 5 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0275
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 5 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-1813
Status:
final
Fee:
$212
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM25-0039
Status:
final
Fee:
$242
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU25-0005
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE25-0039
Status:
final
Fee:
$162
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-1685
Status:
final
Fee:
$212
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-1480
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Generator use
2025-01-28
Install right side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0234
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical... see more
Valuation:
N/A
Permit #:
PM24-0528
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical... see more
Valuation:
N/A
Permit #:
PGU24-0103
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install secondary front yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site for final electrical... see more
Valuation:
N/A
Permit #:
PE24-0518
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-0541
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0118
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-0583
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line
Valuation:
N/A
Permit #:
PGU22-0075
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A

Similar Contractors See more

License # 2101128991
116
BZ Score
-
Avg Project
-
Projects
License # 2102206965
120
BZ Score
$180K
Avg Project
-
Projects
License # 6114529
125
BZ Score
$2.7K
Avg Project
-
Projects

Metro Electric Reviews

BuildZoom hasn't received any reviews for Metro Electric. Click here to be alerted when reviews are posted about them.
Please write a review about Metro Electric
1 Rate this electrician
Click stars to rate
2 Provide a detailed review of this electrician.