×

We'll help you find the right contractor.

Share your project details and we'll reach out to Newcomer plumbing of Kansas City so you don't have to.

We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.

Get Started
N

Location and Projects

Address
160 Old Cannon Ball Rd, Holt, MO, 64048
Use our bidding system to request a quote

Newcomer plumbing of Kansas City

Full-Service Plumbing Company in Kansas City!

From BuildZoom: Newcomer plumbing of Kansas City, 160 Old Cannon Ball Rd, Holt, MO (Owned by: Newcomer's Plumbing And) holds a Contractor / Craftsmen License license and 7 other licenses according to the Missouri license board.

Their BuildZoom score of 108 ranks in the top 5% of 23,328 Missouri licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Newcomer plumbing of Kansas City, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.

Newcomer plumbing of Kansas City Services

Start a project today:

Newcomer plumbing of Kansas City Contact Information

Phone: (816) 307-4432
Address: 160 Old Cannon Ball Rd, Holt, MO 64048

Building Permits by Newcomer plumbing of Kansas City

Sort by: Notable Notable | Date Date | Job Value Job Value
Excavation for water pipeline
2025-05-30
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02445
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-04-17
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01573
Status:
complete
Fee:
$195
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-04
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-01524
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2025-07-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2025-02744
Status:
complete
Fee:
$400
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-12-06
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03886
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-10-10
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03198
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-08
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-03001
Status:
complete
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-07-09
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-01736
Status:
issued
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-03-18
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2024-00955
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2023-05-19
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-01273
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Plumbing general - residential
2025-10-15
Install wwv gas piping set fixtures and sanitary sewer on private property for new s/f home includes bfp for lawn irrigation
Valuation:
N/A
Permit #:
CPPR-2025-01043
Status:
complete
Fee:
$80
Permit Type:
N/A
Building Type:
N/A
New service line work - water sewer or storm
2025-04-25
3/4 x 12 tap; 3/4 dom svc;5/8 mtr outside 3/4 li dc bfp 4” san swr conn and insp water exc san swr exc cpbr-2025-00536
Valuation:
N/A
Permit #:
WS-PW-PR-2025-00521
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
New service line work - water
2025-02-19
3/4 x ; 3/4 dom svc;5/8 mtr outside 3/4 li rpz bfp 4” san swr conn and insp water exc san swr exc cpbr-2024-01348
Valuation:
N/A
Permit #:
WS-PW-PR-2025-00166
Status:
issued
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
New service line work - water
2025-05-21
3/4 x ; 3/4 dom svc;5/8 mtr outside 3/4 li bfp 4” san swr conn and insp water exc san swr exc cpbr-2025-00563
Valuation:
$0
Permit #:
WS-PW-PR-2025-00683
Status:
issued
Fee:
$0
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2024-03-18
Since work is on or near a residential street no traffic control permit is necessary as long as the work is continuous and if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be mai... see more
Valuation:
N/A
Permit #:
PW-EXC-2023-05918
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2022-07-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-00277
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2022-07-20
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-00284
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2022-08-25
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-00899
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
Excavation for water pipeline
2022-08-23
Since work is on or near a residential street no traffic control permit is necessary if contractor can complete work while maintaining two-way directional traffic flow. traffic control and signage complying with part 6 of mutcd will still be necessary; however no traffic control permit is required. if two-way directional traffic flow cannot be maintained contractor shall obtain traffi... see more
Valuation:
N/A
Permit #:
PW-EXC-2022-00896
Status:
complete
Fee:
$390
Permit Type:
N/A
Building Type:
N/A
New water service line - residential domestic
2025-10-01
3/4 x 8 tap ; 3/4 dom svc;5/8 mtr outside insp water exc cpbr-2025-00435 (reg no. 204870)
Valuation:
N/A
Permit #:
WS-N-204870
Status:
expired
Fee:
$712
Permit Type:
N/A
Building Type:
N/A

Newcomer plumbing of Kansas City Reviews

BuildZoom hasn't received any reviews for Newcomer plumbing of Kansas City. Click here to be alerted when reviews are posted about them.
Please write a review about Newcomer plumbing of Kansas City
1 Rate this plumber
Click stars to rate
2 Provide a detailed review of this plumber.