Share your project details and we'll reach out to
Nick Durkee
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Nick Durkee at East Boston, MA 02128, held a General Contractor license (#CS-107110) with the Massachusetts contractors license board with an expiration date of 05-20-2021. We last verified the license was inactive on 07-06-2026.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 139,240 Massachusetts contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
500 boylston street parking level 1. new building amenity bathrooms and shower rooms adjacent to bike storage area. new walls architectural finishes and mep fa fp. no structural. [eplan]
Offices stores garage and restaurant temporary for: offices13th floor (on the 500 boylston street side) only.; certificate valid for 90 days; expires 6/5/2020;;pending the buildings smoke control test. alt949792 - 5/16/19
Barber shop lab school bank retail restaurant day care car wash rental agency and offices group a-3 seating (tables &; chairs) with a max capacity of 278 persons temp. certificate for: office - 11th floor - valid for 90 days; 7/10/19 pending completions permit alt907839 - 1/3/19
Park square executive search design services - 17th floor -; ;interior renovations to existing office space for new tenant. scope of work includes new architectural finishes and rework of existing mep fa fp. no structural
Offices storage warehouse light manufacturing photo studio and restaurant with takeout use and live entertainment use certificate for the 6th floor office(s) alt934726 issued: 4/1/19 &; sf940742 issued: 9/5/19
125 guest street first floor retail space a. interior fit-out of white boxes space for new tenant. renovations include the installation of two bathrooms and rework of existing mep fa fp. no structural
500 boylston street partial 13th floor 6, 500 sf interior office renovation. architectural finishes and re work of plumbing hvac fire protection electrical and fire alarm
500 boylston street 24th floor webster bank corporate offices. interior office renovation from shell condition to office finishes including architectural finishes mechanical plumbing fire protection electrical fire alarm. no structural
100 high street food hall. build-out for;french bistro;with take out. interior millwork connections to kitchen equipment and finishes. no fire alarm no fire protection no egress no structural
23rd floor: interior renovations to 60 state street 23rd floor existing office space including new architectural finishes rework of mep's fa and fp systems all within the confines of the 23rd floor. no structural
Princeton risk partners -;22nd floor -; ;interior tenant fit-out from white box shell space. rework existing mep hvac new lighting new kitchenette. rework fire alarm and fire protection for new layout. no structural
12 farnsworth street retail first floor. minor demolition separate electrical services relocate t stats and install water sub meter. no fire alarm no structural
According to the Massachusetts Department of Public Safety, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Nick Durkee at the Massachusetts Department of Public Safety.
This is a sample of licensing data; click here to access a complete history.