Share your project details and we'll reach out to
North Bay Landscape Management Inc
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
North Bay Landscape Management Inc, 444 Payran St, Petaluma, CA (Employees: Jeffrey Lynn Pottorff, Kevin David Pottorff, and Susan M Pottorff) holds a General Building, Landscaping license according to the California license board.
Their BuildZoom score of 89 does not rank in the top 50% of California contractors.
Their license was verified as active when we last checked. If you are thinking of hiring North Bay Landscape Management Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway living and office. kitchen remodel and 2 baths remodel
Excavte in the pavement along roblar rd pepper rd and mecham rd to conduct, deflection testing and pavement cores.as per attached drawing and county standards. roblar rd: stony point rd to valley ford rd pepper rd: bodega ave to mechum rd mecham rd: pepper rd to stony point rd
Install improvements in the county right-of-way along petaluma blvd south per county standards and per attached approved civil design consultants inc plans titled novato disposal petaluma boulevard south improvement plans, located in petaluma. this permit covered the water line installation only. applicant to reapply to do the rest of the improvements once cal trans finishes their im... see more
Install bike lane striping along petaluma blvd. as per attached plans titled city of petaluma 2007 petaluma boulelard north bike lane project city project no. 200108 prepared by green valley consulting engineers. location of work as per attached plans
Excavate and install 2 driveways x-culvert. water service and roaway improvements as per attched plans titled 2192 2365 & 2707 francisco avenue improvement plans of public sewer water main street pedestrian access and private sewer force main improvements part a prepared by brelje and race signed and dated 10/18/2002. 33 to 46 miles east of fulton road located in santa rosa
For four lateral inspections only. applicant to apply for seperate sewer permit to hook up future buildings. public works is inspecting the storm drain project. prmd staff to inspect sewer laterals only. public works will inspect the trench backfill from top of pipe and trench patch and slurry seal. as per dave danmuller
Excvate in the pavement along hill rd to install a 8" water line and water services as per attached plans titled "valley of the moon water district" " glen ellen water storage tank district project no. 2855 march 2005" prepared by winzler and kelly. located in sonoma.
Construct roadway improvements sewer and water along avalon ave between sebastopol road and 200 feet southerly in santa rosa as per attached plans of avalon ave & grandberg court sewer & water improvements prepared by the city of santa rosa dated june 2002
Excavate and install water and sewer facilities along along dutton ave west ave leo drive westwood drive and southwood drive in the roselandarea of santa rosa as per attached plans of south park sanitation district collection system improvements phase 1
Excavate and install bore pits along bodega ave and bore along bodega ave to install & 6 water line as per attached plans titled wilmar union school district-wilson elementary school water supply project prepared by nlote beyond engineering located in petaluma
Excavate in the pavement to install a 14" sewer main along llano rd. as per attached plans titled" laguna force main replacement" prepared by green valley consultants. .52-.57 miles north of ludwig ave. located in sonoma.
Excavate in the pavement for core drilling for pavement varification along meachum rd and roblar rd as per attached drawing. roblar road p.m. : 10.00 10.92 11.84 12.76 13.60 14.30 & 16.50 meachum road p.m. : 10.00 10.95 & 11.91
Excavate and install a 8 water main water laterals and fire hydrant along b street and fulton rd as per attached california american water drawing. 00-.05 miles west of fulton rd and 02 miles south of river rd. located in fulton
Excavate off the pavement and in the pavement for bell holes and bore across airport blvd to install underground facilities as per attached pg&e plans at the intersection of airport blvd and brickway blvd. located in santa rosa
Excavate and install water facilities in the guerneville and monte rio areas as per plans of sweetwater springs water district -phase iii waterdistribution improvement project prepared by winzler & kelly dated march 2001
Construct a new driveway and install sewer serviceat 475 aviation blvd. northwest of santa rosa as per attached plans of oak valley business park prepared by brian kangas foulk consulting engineerdated 8/18/00
Clearing grading storm drain and paving for access roadway connecting round barn circle to old redwood hwy over lots 4 & 5 and portion of lot 7 (remainder of roadway part of previously issued permit for lot 7)
Conduct traffic control along madrone road while installing a new 27 water main on private property as per enclosed sonoma county water agency plans eldridge- madrone pipeline dated july 2003