×

Don't wait to get an Electrician

We make finding an electrician fast, easy, and commitment-free.

Call now (623) 259-4111
  • Local & Qualified
  • Rapid Connection by Phone
  • Commitment-Free Calls
Is this your business? Claim now >

Location and Projects

Address
Waterford, MI, 48329
Use our bidding system to request a quote

Oak Electric

Oak Electric, Waterford, MI (Owned by: Christopher Heslip) holds a Plumbing Contractor license and 3 other licenses according to the Michigan license board.

Their BuildZoom score of 105 ranks in the top 8% of 167,179 Michigan licensed contractors.

Their license was verified as active when we last checked. If you are thinking of hiring Oak Electric, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.

Oak Electric Services

Start a project today:

Oak Electric Contact Information

Oak Electric Waterford

Quality

105
92nd percentile
Pro tip: We generally recommend hiring a contractor with a score higher than 95.
Oak Electric has a BuildZoom score of 105, which places them above 92% of 167,179 contractors in Michigan.

Activity

72 projects
2025
155 projects
2024
106 projects
2023
Our building permit records indicate that Oak Electric has worked on at least 333.0 projects over the past 3 years.

This is an overview of this contractor's activity. Click here to access our complete licensing and building permit database.

Experience

312 projects
Electrical projects
Analyzing permits over the last 4 years shows that Oak Electric mostly works on electrical project projects.

Pricing

4 projects
$5k-$20k
3 projects
$20k-$50k
Value Not Public: 312.0 projects
Pro tip: For more details about their pricing, check out their recent activity to see how much they have charged for different types of work.

Building Permits by Oak Electric

Sort by: Notable Notable | Date Date | Job Value Job Value
Relocate generator from rear yard to secondary front yard. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line. 1 inspection contractor must be on site f... see more
Valuation:
N/A
Permit #:
PM23-1212
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-1084
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0179
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-1129
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-0347
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0070
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-0346
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-0659
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-0660
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-1164
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0187
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install left side yard generator. the generator must be placed immediately adjacent (maximum 5 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-1234
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-0006
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM23-1500
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU23-0329
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE23-1617
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A
Install right side yard generator. the generator must be placed immediately adjacent (maximum 36 clearance) to the residential building and screened from view with evergreen plantings according to the township code of ordinances. generators must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-0079
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PM24-0579
Status:
final
Fee:
$167
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PGU24-0117
Status:
final
Fee:
$52
Permit Type:
Generator
Building Type:
N/A
Install rear yard generator. the generator must be placed immediately adjacent ( maximum 36 clearance) to the wall of the building and must not register more than a 70 db(a) noise level at the closest property line 1 insp. contractor must be on site for final electrical inspection
Valuation:
N/A
Permit #:
PE24-0571
Status:
final
Fee:
$137
Permit Type:
Generator
Building Type:
N/A

Similar Contractors See more

License # 2101128991
116
BZ Score
-
Avg Project
-
Projects
License # 2102206965
120
BZ Score
$180K
Avg Project
-
Projects
License # 6114529
125
BZ Score
$2.7K
Avg Project
-
Projects

Oak Electric Reviews

BuildZoom hasn't received any reviews for Oak Electric. Click here to be alerted when reviews are posted about them.
Please write a review about Oak Electric
1 Rate this electrician
Click stars to rate
2 Provide a detailed review of this electrician.