Piazza Construction, Penngrove, Po Box 573, Penngrove, CA (Employees: James Anthony Piazza and Patrick Anthony Piazza) holds a General Engineering license and 1 other license according to the California license board.
Their BuildZoom score of 98 ranks in the top 16% of 336,931 California licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Piazza Construction, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Excavate in the pavement to install a 6 and 12 water main along:river rd (cloverdale) as per attached plans titled improvement plans water supply &treatment improvements palamino lakes mutual water company prepared brelje and race consulting civil engineering. cloverdale
To excavate in the pavement and install bore pits then install a 6"water line along:old monte rio rd. as per attached plans titled sweetwater springs 2015 capital improvement project april 2014 for guerneville prepared by coastland engineering. located in guerneville
Excavate in the pavement to install a 6 & 2 water line along: hidden valley rd hiddden valley rd west and guernwood ln. as per attached plans titled sweetwater springs 2014 capital improvement projects may 2013 for guerneville sonoma county prepared by coastland engineering. located in guerneville
Excavate and install bore pits and bore under bodega hwy to install a 6 water line and construct a driveway approach to county standards on the south side of bodega hwy. as per attached plans and attached county standards. 00-.02 miles west of salmon creek rd. located in bodega bay
Excavate and install roadway improvements on the east side of neely road as per attached plans titled neely road slide repair signed and dated 10/26/06. 02 miles north of orchard rd. located in guernville
Excavate in the pavement to install a 6 2 & 1 water line along: canyon 7 paradise rio nido rd lovers ln lovers ct barranca way middle terrace and starrett hill rd. as per attached plans titled sweetwater springs 2013 capital improvement projects march 2012 for guernwood park rio nido & monte rio. prepared by coastland engineering. located in monte rio and guernville
Excavate and reconstruct two (2) bore pits per county standards on the east and west side of stony point rd 0.54 miles north of pepper rd to install a 6 hdpe conduit below the stony point rd structural section located in petaluma
Replace approximately 60 feet of c900 6” water main in private street easement at intersection of palomino road and madrone road for palomino lakes mutual water company – contract price is $10 450.00
Excavate off the pavement to install 4 x 4 bell holes and bore across mark west station road to install 1 - 4 electrical conduit as per attached brelje and race drawing 01 east of trenton healdsburg road located in windsor. permittee is also allowed to trim trees within the limits of the overhead electrical lines within the project
Excavate and install an 6 water line along hillcrest ave craigmont dr and woodland and tie a 4 water line into a 6 water line at lomita ave and indian ln as per attached plans titled valley of the moon water district improvement plans for augua caliente & el verano water system improvements prepared by cinquini & passarino inc located in sonoma
Excavate and install an 2 & 6 water line along guernwood rd monte cristo ave and riverside dr as per attached plans titled improvement plans cip phase iv-a prepared by brelje and race located in guernville. (revised) install two bore pits and bore under center way and excavate in ceter way to install a 4 water main and water services..00-.09 miles south of guernwood rd
Contractor to install 12 x 12 x 12 cut-in tee with a 8 inch main line valve per approved plan contact inspector 72 hours prior to cut-in request date to arrange for inspection and main shutdown times note: this application may require a lowering of the main install a cross as noted on plan prior to installing hydrant and water meter set-up per standard 857 and 870 manifold depth for m... see more
Excavate in the pavement and install bore pits along davis ln and dutch ln and bore along dutch ln to install a 8 water line as per attached plans titled dutch lane water main project prepared by demensions 4 engineerig. located in penngrove
Bore along the east side of sierra grande drive to install 2 water line and to tie into existing 6 water line as per attached plans titled water main extension project prepared by brelje and race located in bodega bay