Their BuildZoom score of 110 ranks in the top 4% of 131,387 Virginia licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring Richard L Crowder Construction Inc, we recommend double-checking their license status with the license board and using our bidding system to get competitive quotes.
Plumbing (ug) - sanitary sewer - install 58 lf of 4 pvc and 119 lf of 6 pvc. install cleanouts. install 6 internal drop stack. connect to existing manhole. waterline - install 20 lf of 2 copper and 180 lf of 2 black poly. install 1 water meter. connect to existing 8 waterline. bank of america bridgewood commons
Exterior underground sanitary sewer to 5 of building consisting of 35 of 8 sdr-35 and one manhole exterior underground domestic water line consisting of 30 of 3 sch-40 pvc have the approved plans onsite and available to the inspector at all reasonable times
Supply water and sewer lines to our construction trailres on the byrd park job site. these lines will be tapped off of trafford pump station. building permit # bldc-117295-2023. have the approved plans onsite and available to the inspector at all reasonable times
Valuation:
N/A
Permit #:
PLBC-119243-2023
Status:
expired
Fee:
N/A
Permit Type:
N/A
Building Type:
N/A
Work in street & alley prmt - internal permits (created for cor) - class 0
Byrd park water storage roof replacement is a 3 year project awarded to crowder construction company by the city of richmond **installation of 36” tank overflow piping that crosses grant street and strollers lane. i have attached our original permit application/permit (wisp-119166-2023) as well as information for the new closures. a couple things to note:** blocked area with equipment... see more
Fire ug - exterior fire line and riser. install 32 of 6 ductal iron pipe to a bend. install 1 ea 6 90 bend with mega lug. install ~5 of dip to 1 ea zurn 6 one-piece fireline riser. fdc on building and backflow in riser room. hydrant within 50 of fdc. future moore's lake (2 over 2's) apartment building 12
Fire ug - exterior fire line and riser. install 26 of 6 ductal iron pipe. install 1 6 90 bend with mega lug. install 1 ea zurn 6 one-piece fireline riser to 1 above. fdc on building. backflow in riser room. future moore's lake (2 over 2's) apartment building 15
Fire ug - exterior fire line and riser. install 35 of 6 ductal iron pipe beginning at the county valve to 1 6 tee with mega lug. install 24 of 6 dip to 1 ea 6 zurn one-piece fireline riser to 1 above. fdc on building and backflow in riser room. hydrant within 50 of fdc. future moore's lake (2 over 2's) apartment building 6
Fire ug - exterior fire line and riser. install 33 of 6 ductal iron pipe to 1 6 tee with mega lug. install 24 dip from tee to 1 ea 6 zurn one-piece fireline riser to 1 above. fdc on building and backflow in riser room. future moore's lake (2 over 2's) apartment building 5
Fire ug - exterior fire line and riser. install 57 lf of 6 ductal iron pipe. install 1 ea 6 tee with mega lug. install 1 ea 6 fireline riser. piv not required due to rated riser room. 1 piece zurn riser ~5 into building and 1 above grade in projected riser room. fdc on building. hydrant <50 from fdc. future moore's lake (2 over 2's) apartment building 3
Remove and replace existing roofs on 56.1 mg byrd park tanks provide new tank outlets gates tank overflow systems roof vents exhaust fans tank inlet mixing systems instrumentation and plc/scada improvements. provide tank roadway and site fencing improvements. other miscellaneous facility improvements including new electrical building
Fire ug - this rti#1 addresses the use of a beasley vault in place of the originally proposed hanover vault. install 6 double check vault assembly 260 of 6 pvc c900 pipe and a 6 fire line riser to 1 above finished floor. bridgewood retail building
Fire ug - exterior fire line and riser. install 42 of 6 ductal iron pipe. install 1 ea 6 90 bend and 6 dip to riser. install 1 ea zurn 6 one-piece fireline riser to 1 above. fdc on building. backflow in riser room. future moore's lake (2 over 2's) apartment building 13
A new firehouse is proposed for the site. project consists of demolition of a 1 story building asphalt concrete building foundation underground utilities and other associated site features
Fire ug - install 27 of 6 dip from utility connection to a 6 tee with mega lug. install 35 of 6 dip from mega lug to a 1 piece zurn riser ~5 into building and 1 above grade in projected riser room. fdc on building. hydrant <50 from fdc. moore's lake (2 over 2's) apartment building 1
Plumbing - install 128 lf of 6 ductile iron sanitary ser with cleanouts 90 lf of 1.5 copper water service & 40 lf of copper irrigation service 1.5 & 3/4 water meters with bfp's. chase bank - hull and duckridge
Fire ug - exterior fire line and riser. install 26 of 6 ductal iron pipe to 1 zurn 6 one-piece fireline riser to 1 above. fdc on building. backflow in riser room. future moore's lake (2 over 2's) apartment building 14
Fire ug - exterior fire line and riser. install 28 of 6 ductal iron pipe from the boundary valve to one 6 90 bend. install ~7 of 6 dip from bend to one 6 zurn one-piece fireline riser. fdc on building and backflow in riser room. hydrant within 50 of fdc. future moore's lake (2 over 2's) apartment building 11