Share your project details and we'll reach out to
Roof Diagnostics Solar & Electric of Connecticut LLC
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
Roof Diagnostics Solar & Electric of Connecticut LLC
Roof Diagnostics Solar & Electric of Connecticut LLC at 299 Industrial Park Rd, Middletown, CT 06457, held a Electrician license (#HIC.0634974) with the Connecticut contractors license board with an expiration date of 11-30-2017. We last verified the license was expired on 08-21-2023.
Their BuildZoom score is 0 because we haven’t been able to verify an active license. As a result, they’re not ranked in the top 50% of 12,093 Connecticut contractors.
If you’re thinking about hiring them, we recommend double-checking their license status with your local licensing authority. Alternatively, use our bidding system to be easily matched to qualified, licensed professionals in your area.
Roof Diagnostics Solar & Electric of Connecticut LLC Services
Solar roof system installation (20-panels / 5.10 kw). note 1: all work shall be performed by qualified licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install. refund iss'd-check sent out 4/22/2016 klb
Roof and structural upgrades, as outlined within engineer's report, in preparation of (22) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (32) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (17) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (16) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (25) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install. **canceled permit** **refund check sent out 4/22/2016
Roof and structural upgrades, as outlined within engineer's report, in preparation of (17) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install. **canceled permit** **refund check sent 4/22/2016
Roof and structural upgrades, as outlined within engineer's report, in preparation of (36) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (18) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (15) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation for the installation of 35 panels and micro-inverters. note 1: all work shall be performed by qualified, registered, licensed personnel. note 2: all engineered plans/revsions (originals) shall be submitted not later than 48 hours prior to installation of panels. **canceled permit** **refund iss'd**check... see more
Roof and structural upgrades, as outlined within engineer's report, in preparation of (19) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (30) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install.
Roof and structural upgrades, as outlined within engineer's report, in preparation of (20) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install. refund iss'd -sent out check 4/22/2016 klb
Roof and structural upgrades, as outlined within engineer's report, in preparation of (25) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install. **canceled permit** **refund iss'd** check iss'd 4/22/16.
*1231 east main street: installa new tpo roof system over existing roof system - approx. 50, 300 sf. remove metal panel of sloped rof surface & install new shingle roof all to code
Roof and structural upgrades as outlined within engineer's report in preparation of (34) solar panel installation. note 1: all work shall be performed by qualified registered/licensed personnel. note 2: all engineered plans/revisions (originals) shall be submitted not later than 48 hours prior to solar panel install
Installing 16 pv roof mounted solar panels and micro inverters. 4.035 kw dc. also, sistering new 2x6 rafters along side each existing rafter to support the load. permit attached to te-145-1093
Roof Diagnostics Solar & Electric of Connecticut LLC Reviews
BuildZoom hasn't received any reviews for Roof Diagnostics Solar & Electric of Connecticut LLC. Click here to be alerted when reviews are posted about them.
Please write a review about Roof Diagnostics Solar & Electric of Connecticut LLC
Roof Diagnostics Solar & Electric of Connecticut LLC License info
Inactive License
License #
HIC.0634974
Status
Inactive
State
Connecticut
Type
Home Improvement Contractor
According to the Connecticut Department of Consumer Protection, the status of this license was at one point cancelled. However, this information may have changed. If this is your business, please update your license status.
Check this license's status for Roof Diagnostics Solar & Electric of Connecticut LLC at the Connecticut Department of Consumer Protection.
This is a sample of licensing data; click here to access a complete history.