Their BuildZoom score of 91 ranks in the top 37% of 55,771 Tennessee licensed contractors.
Their license was verified as active when we last checked. If you are thinking of hiring SCC Sprinklers Inc, we recommend double-checking their license status with the license board and using our project planner to get competitive quotes.
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc: set meter on flushing device inspection date: 6/30/15 plumber to supply 1 flex net meter with mxu
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc: no measurement on file inspection date:6/30/15 plumber to supply 5/8 sensus flexnet meter on commercial for fire sprinkler
Note 1: all mxu devices must be mounted in the meter box lid. note 2: backflow tests (when applicable) will be conducted on initial meter inspection. note 3: if meter is not picked up from permit office within 5 days permit will be cancelled. set meter off rtc: no measurement on file inspection date: 6/30/15 plumber to supply 1 sensus flexnet meter on commercial (for flushing device)
Note 1: all mxu devices must be mounted in the meter box lid. note 2: backflow tests (when applicable) will be conducted on initial meter inspection. note 3: if meter is not picked up from permit office within 5 days permit will be cancelled. set meter off rtc: no measurement on file inspection date: 6/30/15 plumber to supply 5/8 sensus flexnet meter on commercial for fire sprinkler
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:new conn inspection date:6-30-15 plumber to supply 5/8 radio read meter for ddcva
Note 1: all mxu devices must be mounted in the meter box lid.
note 2: backflow tests (when applicable) will be conducted on initial meter inspection.
note 3: if meter is not picked up from permit office within 5 days, permit will be cancelled.
set meter off rtc: set meter on ddcva
inspection date: 10/14/14
plumber to supply 5/8" flex net meter with mxu
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc:plumber will supply a 5/8 flexnet meter inspection date:12/3/12 psi 42 flex net meter required
Note 1: all mxu devices must be mounted in the meter box lid. note 2: backflow tests (when applicable) will be conducted on initial meter inspection. set meter off rtc: plumber will supply a 5/8 sensus radio read meter inspection date:12/3/12 psi 85 radio read meter
Note 1: all mxu devices must be mounted in the meter box lid note 2: backflow tests (when applicable) will be conducted on initial meter inspection set meter off rtc: plumber will supply a 5/8 sensus radio read meter inspection date:12/3/12 psi 85 sensus radio read meter
Note 1: all mxu devices must be mounted in the meter box lid. note 2: backflow tests (when applicable) will be conducted on initial meter inspection. set check meter on exisitng service 5/8 inspection date:4-12-13 contractor to purchase 76 psi radio read meter
New 3" tee being cut into public 3" main and extended over to property for new metered fire service
inspection date:5-22-08
plumber to set up tap and cut in tee for fire service/fire sprinkler co to install fire service with 72 sprinkler heads plumber to furnish 5/8 meter with mxu ddcva
Contractor, Contractors: Contractors And Ltd Licensed Plumbers
BuildZoom verified this license was active as of April 2026.
Verify this license's status for SCC Sprinklers Inc at the Tennessee Department of Commerce and Insurance.
This is a sample of licensing data; click here to access a complete history.
License Not Verified
License #
15816
Status
Active
State
Tennessee
Type
Contractors
When BuildZoom last verified this license, it had an expiration date of March, 2014. Check the current license status of SCC Sprinklers Inc with the Tennessee Department of Commerce and Insurance
This is a sample of licensing data; click here to access a complete history.