Share your project details and we'll reach out to
SKYLINE CONSTRUCTION CO
so you don't have to.
We'll also connect you with other vetted professionals who are a strong match for your project. That way, you can compare quotes, meet different contractors, and make the choice that feels right for you.
With nearly four decades of experience, this Salinas-based contractor focuses on commercial interior construction for clients throughout the region. Established as a 100% employee-owned company, they bring collaborative project management and an ownership-driven approach to building offices, workspaces, and other commercial environments. The team specializes in transforming interior spaces to improve functionality and support innovation and business growth. Emphasizing transparency and strong client partnerships, they deliver projects at scale for businesses seeking comprehensive interior build-outs or remodels. Their portfolio demonstrates expertise in managing complex commercial interiors from planning through completion, using local market knowledge to streamline the process for property owners and managers.
Ground floor: demolish of (e) walls plumbing fixtures doors ramp and partial platform. new construction of tenant fit out for proposed bank branch space inlcluding lobby cash room restroom and pantry with new plumbing fixtures. exterior scope includes new entry doors and atm
Tenant improvement 7th fl to consist of demolish on non load bearing partitions floors ceilings finishes. construction of new non load bearing partitions finishes lighting maher not req
16th fl - single tenant fl w/approximator of work to be 4000 sf. removal of interior stairs connecting 16th & 17th fl; removal of interior partitions & finishes; new reception bathroom & copy room; no changes to bathroom or pantry fixtures; 17th fl - removal of int stairs connecting 16th & 17th
31st floor:t.i. includes demolish of non structural partitions and buiding new non stuctural partitions. some new or revised meps and fire alarm and sprinklers work will be design building and submitted seperately (bldg is fully sprinklered). (ref pa#201908088304)
49th fl consists of demolition of (e) non-structural partitions doors finishes ceiling grid & tiles lighting and power. construction of new non-structural partitions glazing doors ceilings lighting finishes and power
Minor modifications to the offices of a single tenant spread across 3 fls. level 21, 22, 23. totaling approx 8600 sq ft. including demolish of partitions and removal of finishes building back of 24 new offices and 2-3 new conference rooms
7.6.23- cancelled interior tenant improvement of one partial floor level 01. plans outline scope of work required for interior tenant improvement. work inlcude constution of walls ceiling and finishes including the addition of a clean room space
12th floor office tenant improvement to include soft demolish to remove and addition new partition walls. includes replacing fixtures and finishes. mep and fire sprinkler under separte permits
1/f-3/f: tenant improvement on the 1st 2nd and 3rd fl to include construction of new offices lighting restrooms millowrk and finsihes. mep life saftey and fire sprinkler under sep permit
32nd fl: tenant improvement. in a 33 floor hi-rise bldg.selective demolish, new partiitons, doors, ceilings, mechanical, electrical & plumbing. work cafe classifed as employee breakroom/pantry. no change of use
Level 1 to 4 -remove of (e)interior partition flooring finishes ceiling millwork mechanical elect fire alarm devices sprinklers and equipment not intended to be reused no demolish of structure no enterior demolish except for disabled access to vacant space per ab017 (sprinkler tenant improvement for demolish = 202306079420)
Removal of building entrance storefront exterior metal fence and gate exterior terrance paving and ceiling. construction of new building entrance storefronts planters pavings and ceiling. no demolition or modification of existing structural elements
Tenant improvement & barrier removal create accessible entrance & egress.(n) accessible lift to be provided to (e) main entry door to clear path of travel to tenant space. circulation path to connect all rooms. (n) data & power outlets to (e) office area. change of use from pdr warehouse to pdr light manufacturing
4th & 5th fl: interior tenant improvement includes new non-load bearing partitions ceilings work finishes and casework. installation of horizontal exit assembly. change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code
Change of use from bank to design professional and 4 tenant spaces. tenant improvement of basement ground to include selective demolish construction of new non-load bearing partitions new ceiling grid & tile new light fixtures new office doors and frames. mep deferred. fire sprinkler & fire alarm
Tenant improvement for 16, 000sqft office space new paritions will be constructed for offices small meeting rooms training rooms and a break room. there will be miner upgrades to finishes in e toilet rooms. mep & life safety under a separate permit